首页> 外文会议>International Conference on Applied Mathematics in Engineering and Reliability >A dynamic grouping model for the maintenance planning of complex structure systems with consideration of maintenance durations
【24h】

A dynamic grouping model for the maintenance planning of complex structure systems with consideration of maintenance durations

机译:考虑维护持续时间的复杂结构系统维护规划动态分组模型

获取原文

摘要

In the framework of maintenance optimization of multi-component systems, dynamic grouping has developed and becomes an interesting approach. However, most existing dynamic grouping models assume that the repair time is negligible. This assumption may be not always relevant and limits the application of these models in many real situations. The main objective of this paper is to develop a dynamic grouping model taking into account both preventive and corrective maintenance duration for complex structure systems. Analytical method is developed for the evaluation of total maintenance cost. This analytical method helps to overcome, when compared with simulation methods, the computational time problem which often is a big problem for the maintenance optimization of systems with a large number of components. A numerical example is presented to show how the proposed grouping approach can be used for the maintenance planning of a complex structure system containing 12 components. A link with the coastal highway route E39 project is also discussed.
机译:在多分量系统的维护优化框架中,动态分组已经开发并成为一种有趣的方法。然而,大多数现有的动态分组模型假设修复时间可以忽略不计。此假设可能并不总是相关的并且限制在许多真实情况下这些模型的应用。本文的主要目的是开发一种动态分组模型,考虑到复杂结构系统的预防性和纠正维护持续时间。开发了分析方法,用于评估总维护成本。与仿真方法相比,该分析方法有助于克服,该计算时间问题通常是具有大量组件的系统维护系统的大问题。提出了一个数字示例以显示如何用于如何用于含有12个组件的复杂结构系统的维护计划。还讨论了与沿海公路路线E39项目的联系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号