首页> 外文会议>SPE Intelligent Energy International Conference and Exhibition >Risk-Based Prioritization Abandonment Strategy for Inactive Subsea Wells
【24h】

Risk-Based Prioritization Abandonment Strategy for Inactive Subsea Wells

机译:非活动海底井的风险基于优先级放弃策略

获取原文

摘要

Well abandonment, although an activity as old as the art of well construction itself, undoubtedly is perceived as a high cost, revenue-eroding commitment for exploration and production companies. Nonetheless the fulfillment of this obligation is non-negotiable for an operator, and thus the application of an efficient methodology to prioritize the abandonment of inactive wells, and ultimately reduce risk exposure is fundamental for a cost effective abandonment campaign. This paper describes how an exploration and production company ("the Company"), working in conjunction with an asset risk management consultancy, successfully developed and applied a qualitative risk-based abandonment prioritization strategy for an inventory of inactive subsea wells. The exercise entailed a preliminary identification of the inactive subsea well inventory, after which a qualitative assessment methodology was devised using twenty-five well integrity related criteria calibrated to allow for various well types, well function, condition, age, design, history etc. An aggregate of weighted scores was subsequently applied to the Company's corporate risk assessment matrix, for consistency, based on the escalation potential in the event of a loss of containment. The results clearly highlighted the wells with the highest risks and thus formed one of the components (including abandonment phase and operational complexity) of an integrated abandonment campaign, ultimately incorporated into the drilling schedule. An efficient prioritization strategy applied to legacy wells served as an improved risk management and proactive cost allocation tool in the hands of senior decision makers for managing medium to long term liabilities, ultimately leading to reduced risk exposure and long term capital savings.
机译:遗弃良好,虽然作为良好建设本身的艺术的活动,无疑被认为是勘探和生产公司的高成本,收入侵蚀承诺。尽管如此,这项义务的履行是运营商的不可谈判,因此申请有效的方法,优先考虑放弃非活动井,最终降低风险暴露是一个成本效益的遗弃活动的基础。本文介绍了勘探和生产公司(“公司”)如何与资产风险管理咨询公司合作,成功开发并应用了一种无效海底井库存的定性风险的放弃优先级爆发策略。该练习需要初步识别非活动海底库存,之后使用校准的二十五个井完整性相关标准设计了定性评估方法,以允许各种井类型,功能,条件,年龄,设计,历史等。一个随后,加权分数的总数适用于公司的企业风险评估矩阵,以持续损失的升级潜力为一致性。结果清楚地突出了具有最高风险的井,因此形成了集成放弃运动的组件(包括遗弃阶段和运营复杂性),最终纳入钻井时间表。应用于遗产井的有效优先级策略,作为管理中期长期负债的高级决策者手中改善风险管理和主动成本分配工具,最终导致风险暴露和长期资本储蓄。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号