Challenges of Oil and Gas Mega-Projects:Claims Management Process

机译:石油和天然气巨型项目挑战:索赔管理流程

获取原文
获取外文期刊封面目录资料

摘要

One of the major challenges of oil and gas mega projects is the claims management process.This paper willdiscuss how claims,which arise during the lifecycle of a project,can be managed by both the contractorand by the procuring entity.This is particularly relevant to the industry with the recent Covid-19 eventsand its impacts.This paper will evaluate and discuss key risks in the implementation of a project-including project costescalations as well as time overruns and delays to completion of the project or its milestones-and themanagement of claims in relation thereto.This paper will also discuss how risks may be allocated where aproject may be derailed.Secondary impacts will also be considered such as a compromise on quality andpotential defects.Lastly,this paper will cover how formal disputes,which arise when claims cannot beadequately resolved,may be brought about and the best position the procuring entity and the contractor canput themselves in for such proceedings.This paper shall conclude that an optimised"life cycle"approach to procurement is essential.From thebeginning of the project,companies should carefully consider how risks are allocated,and from a practicalperspective,what the most material risks are that are either likely to occur or could have a significantimpact on the project,to ensure in particular that management of those potential risks and impact areadequately addressed in the project documents.During the life of the project there mustbe efficient contractmanagement,it is crucial for the project management team to proactively manage claims in real time toavoid disputes.Lastly,it is key that the company is prepared for formal dispute resolution proceedings byreviewing its position regularly and keeping options open.This paper draws on our legal expertise based on our vast experience in the field.Based on this experience,this paper applies that knowledge to what is critical in the management of claims throughout the lifecycle ofthe project.This will assist companies to allocate risk accordingly,mitigate and manage claims and preparefor potential formal disputes.
机译:石油和天然气巨型项目的主要挑战之一是索赔管理程序。本文将在项目的生命周期内出现的索赔,可以由承包商管理,由采购实体管理。这与工业与最近的Covid-19活动和其影响。本文将评估和讨论实施项目的关键风险 - 包括项目的性能,以及时间超支,并延迟完成项目或其里程碑 - 以及索赔的索赔的初步此文件还将讨论如何分配风险,其中Aproject可能会被淘汰。也将被视为诸如质量和平缺陷的妥协.Llastly,本文将涵盖索赔当索赔时的正规纠纷如何达成妥协解决,可能会带来和最佳地位,采购实体和承包商队伍才能进行此类诉讼。本文应当结论是,优化的“生命周期”采购方法是必不可少的。通过该项目的尼策来,公司应该仔细考虑如何分配风险,并且从实用的审查中,最具物质风险的可能发生或可能有在项目中批判,特别是在项目文件中仍然妥善了解这些潜在风险和影响的管理。在那里有高效的合约管理员的项目的生命,这对项目管理团队实时主动管理索赔至关重要Toavoid纠纷.LLASTLY,该公司编写了正式争议解决程序,通过定期审查其立场并保持备选方案开放。本文根据我们在田地的丰富经验,提出了我们的法律专业知识。基于这一经验,这篇论文在项目的生命周期中,将知识应用于在项目的生命周期中的管理方面至关重要。 ILL协助公司相应地分配风险,减轻和管理索赔并准备潜在的正式纠纷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号