Improving 4-1/2″ Liner Deploy Ability in 6″ Horizontal Hole with Utilization ofImproved Characteristics Brines and Friction Reduction Devices

机译:利用各种特性盐水和摩擦减少装置,改善了4-1 / 2“衬垫部署能力。

获取原文
获取外文期刊封面目录资料

摘要

A large operator of a brown field offshore in the middle east has decided to provide full lower Completionaccessibility and ensure prevention of open hole collapse as it can lead to various gains throughout the lifeof the well.Among those benefits,it provides a consolidated well bore for various production logging &stimulation tools to be deployed effectively,as well as full accessibility,conformance control and enable toprovide production allocations for each zones.However there are multiple challenges in deploying lowercompletion liner in drains involving multiple reservoirs and geo steered wells:Well Bore Geometry,doglegs/tortuosity etc.& differential sticking possibilities and of course the open hole friction.Due to the sizeof the open hole,restricted casing design and utilization of limited OD pipes further add to the complicationsof deploying the Lower completion liner in such brown Field wells.This paper intend to review the multi-step methodology approach implemented in recent years by thecompany to effectively deploy 4-1/2″ Liner in 6″ Horizontal Open Hole section.Among the techniques usedto assist successful deployment of lower completions are:Improving hole cleaning,ensure smooth wellbore with the use of directional drilling BHA,reduction of the Open Hole friction by utilizing Lubricatedbrines,fit for purpose Centralizers,use of drill pipe swivel devices to increase weight available to push theliner & reduce buckling tendency.With the length of open hole laterals reaching up to 10,000 ft for 6″ Lower drains,open hole drag,friction & cleanliness are major components that causes challenges in deploying the Liner till TD.Theuse of specially formulated brines with fixed percentage of lubricants proved to significant reduce frictioncompared to the drilling mud used for drilling the horizontal drain.The combination of low friction brinewith proper centralization/standoff which resulted in reduced contact area with the formation has alsoshown good results in preventing differentials sticking while running the liner through multilayer reservoirshaving significantly different reservoir pressures.Another major constrain to deploy the lower completion liner in this offshore field is the very nature ofthe wells being primarily workover.This involves generally Tie back liners run to shallow depths to restorethe integrity of wells.This limits our ability in the selection of drill pipe that can be used as only smallerOD drill pipes and HWDP can be utilized in order to deploy the Liner to bottom.On many occasions thisprovides only limited weight to push the Liner down to TD and impact our ability to set the liner top packer.Drill pipe rotating swivel devices have been utilized to improve our weight availability & transferability topush the liner down and to set the liner top packers.In order to provide independent deactivation mechanismfor the drill pipe swivel and to have complete success in our liner deployments,a dedicated ball activatedsub was designed to deactivate the swivel acting as back up in case primary deactivation methods failsduring liner setting.The combined use of all these techniques enabled the company to deploy 4.5″ Liners in 6″ Horizontaldrains with high success in this offshore Brown Oil field of UAE.This resulted in better well constructionand complete access to lower drains over the life of the wells.
机译:在中东的棕色田野近海的大型操作员决定提供完全较低的完成性,并确保防止开放孔崩溃,因为它可以在整个生活中导致各种各样的收益。众多这些福利,它提供了一个综合良好的钻孔有效地部署各种生产记录和刺激工具,以及全部可访问性,一致性控制,并为每个区域进行全息生产分配。然而,在涉及多个储存器和地理转向井的漏斗中部署下互换衬垫有多种挑战:孔孔几何形状, Doglegs /曲折等等和差分粘性可能性,当然是开放孔摩擦。为张开孔的尺寸,限制壳体设计和限制OD管的利用进一步加入了在这种棕色领域井中部署下部完成衬垫的并发症。本文打算审查最近实施的多步方法方法多年来通过TheCompany有效地部署了4-1 / 2“衬里在6”水平开孔部分。among的技术通过协助成功部署较低的完井的技术是:改善孔清洁,确保使用定向钻孔BHA,确保光滑的井筒,减少通过利用润滑桥的开放孔摩擦,适合目的的升级器,使用钻管旋转装置增加重量以推动塞林斯和减少屈曲倾向。距离距离高达10,000英尺的开放孔横向达到6“下游,打开孔阻力,摩擦和清洁是主要组成部分,导致衬垫部署到TD。专用配制的盐水具有固定百分比的润滑剂,证明是对用于钻井水平排水的钻井泥浆的显着减少摩擦。低摩擦的组合BreineWith适当的集中/支架,导致接触面积减少,形成前的Alsoshown良好结果通过多层储存器在运行衬里的速度粘住时,通过多层储存率显着不同的水库压力。其他主要约束在这个海上场地部署下井下的井下衬垫是主要的本质,这涉及一般绑定衬里跑到浅层划线到浅层划线井的完整性。这限制了我们在钻杆的选择中的能力,可以仅使用较小的钻杆,并且可以使用HWDP来部署到底部。很多场合,只有有限的重量将衬垫向下推动TD并影响我们设置衬里顶封装的能力。已经利用了旋转管道旋转旋转装置的能力,以提高我们的体重可用性和转移性拆卸下衬垫并设置衬垫顶部包装器。为了为钻杆旋转提供独立的停用机制。并在我们的班轮部署中完成成功,专用的球激活符号为des在初级停用方法失败的衬垫设置中,点燃了作为备份的旋转旋转旋转。所有这些技术的结合使用使公司能够在阿联酋的这种海上棕色油田中成功地部署4.5“衬里。导致更好的井建筑和完全获得井中的较低漏斗。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号