Commissioning Advanced Hoist Technologies to Mitigate Challenges Associated with Selective Workover Wells - A Revolutionary Approach

机译:调试高级提升技术,以减轻与选择性工作台的挑战 - 一种革命方法

获取原文

摘要

Since 2014, ADNOC Onshore has utilized the potential of hoists and commissioned its operational significance, which allowed saving in rig time (4 - 6 rig years per year over 5 years business plan period) and generating a cost saving opportunity. During this period we have faced many challenges and complications mainly during fishing operations which result in unsuccessful retrieval of the completion. Other factors and challenges that are commonly faced which require hoist intervention include: 1. Old wells melted or corroded fish (Tubing + Casing) 2. Reservoir Thammama Zone B wells (High water cut) 3. Pushing the corroded fish 4. Complete plug & abandon 5. Partial plug & abandon required for future side track 6. Wait on conventional rig arrival for intervention. Main challenge we faced during our business development phase is losing number of oil producing wells due to fishing complications, therefore the hoist rig is not capable to drill or sidetrack such wells. This will result in delaying requirements to restore production and meet the field quota objective since the wells should be scheduled to conventional Rig intervention. In order to optimize the hoists capability and performance to overcome this issue, we have to optimize based on priority and cost-effective selection criteria which will support to save the rig time & cost. Various advantages of hoists applications experienced in the last 2 years in ADCO include: 1. Running scraper 2. Corrosion and Cement Bond Logs 3. Faster rig move. 4. Work-over well repairs for single completion (well-kill, pulling old completion and running new completion) 5. Well preparation for re-entry and sidetrack plug back to top of 7'' liner 6. ESP work-over. Pulled old ESP pumps 7. Fishing and milling operations 8. Run 7 "tie back liners. 9. Plug and abandon wells partially or fully Abandonment (inactive string). 10. Spotting and squeezing cement plugs and squeeze off old perforations, changing THS and X-mass tree. 11. Cure Sustainable Annulus Pressure (SAP) 12. Pressure test casing 13. Run completion & special completion such as gas lift mandrels. This paper presents methods of optimizing application of hoist in Abu Dhabi onshore fields by modifying enhanced well selection criteria based on the operation experiment and avoid production loss to sustain our field development plan. This implemented strategy benefit the optimization of number of workover wells which will increase in next five years scenarios, which in turn is expected to utilize rig cost savings. In addition, the new selection criteria will create "fit for purpose" solution to overcome these challenges of existing workover wells with less time and complication.
机译:自2014年以来,Adnoc Onshore利用了升降机和委托其运行意义的潜力,这允许在钻机时间(每年4至6岁以上的商业计划期间为4 - 6个剪刀)并产生成本节约机会。在此期间,我们面临着许多挑战和并发症,主要是在捕捞业务期间导致完成未能成功的完成。其他需要提升干预的其他因素和挑战包括:1。旧井熔化或腐蚀鱼(管道+套管)2.水库托骆驼区B孔(高水位)3。推腐蚀鱼4.完整的塞放弃5.未来侧轨道6所需的部分插头和放弃6.在常规钻机到达中进行干预。我们在业务发展阶段面临的主要挑战正在失去由于捕鱼并发症的产生井的数量,因此葫芦钻机无法钻孔或侧面钻头。这将导致延迟恢复生产的要求,并满足现场配额目标,因为井应调度到常规钻机干预。为了优化升降机能力和性能来克服这个问题,我们必须根据优先级和经济高效的选择标准进行优化,这将支持节省钻机时间和成本。升降机应用在ADCO的过去2年中经历的各种优势包括:1。运行刮刀2.腐蚀和水泥键原木3.更快的钻机移动。 4.完成单次完成的工作良好维修(kill-kill,拉动旧完成并运行新的完成)5。重新入口和侧面的良好准备返回到7'衬垫6的顶部。ESP工作。拉动旧的ESP泵7.钓鱼和铣削操作8.运行7“绑衬垫衬垫。9.插头和放弃部分或完全放弃(非活动字符串)。10.发现和挤压水泥插头并挤出旧穿孔,改变旧穿孔,改变X质量树。11.固化可持续环压(SAP)12。压力试验套管13.运行完成和特殊完成,如燃气升降芯轴。本文通过修改增强良好,介绍了在阿布扎比陆地上的应用优化葫芦的应用方法基于操作实验的选择标准,避免生产损失维持我们的现场发展计划。这一实施的战略有利于未来五年方案增加的工作台井数量,这反过来有望利用钻机成本节约。在此外,新的选择标准将创建“适合目的”解决方案,以克服现有的工作井的挑战,时间和复杂性更少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号