首页> 外文期刊>Scandinavian Journal of Trauma, Resuscitation and Emergency Medicine >Advanced airway management in hoist and longline operations in mountain HEMS – considerations in austere environments: a narrative review This review is endorsed by the International Commission for Mountain Emergency Medicine (ICAR MEDCOM)
【24h】

Advanced airway management in hoist and longline operations in mountain HEMS – considerations in austere environments: a narrative review This review is endorsed by the International Commission for Mountain Emergency Medicine (ICAR MEDCOM)

机译:山区HEMS的起重和延绳钓作业中的高级气道管理-严峻环境中的考虑:叙述性评论该评论获得了国际山地急诊医学委员会(ICAR MEDCOM)的认可

获取原文
       

摘要

Providing sufficient oxygenation and ventilation is of paramount importance for the survival of emergency patients. Therefore, advanced airway management is one of the core tasks for every rescue team. Endotracheal intubation is the gold standard to secure the airway in the prehospital setting. This review aims to highlight special considerations for advanced airway management preceding human external cargo (HEC) evacuations. We systematically searched MEDLINE, EMBASE, and PubMed in August 2017 for articles on airway management and ventilation in patients before hoist or longline operation in HEMS. Relevant reference lists were hand-searched. Three articles with regard to advanced airway management and five articles concerning the epidemiology of advanced airway management in hoist or longline rescue missions were included. We found one case report regarding ventilation during hoist operations. The exact incidence of advanced airway management before evacuation of a patient by HEC is unknown but seems to be very low (
机译:提供足够的充氧和通风对于急诊患者的生存至关重要。因此,先进的气道管理是每个救援队的核心任务之一。气管插管是将气道固定在院前环境的金标准。这篇综述旨在强调在撤离人员外部货物(HEC)之前进行高级气道管理的特殊注意事项。我们于2017年8月系统搜索了MEDLINE,EMBASE和PubMed,以获取有关在HEMS进行葫芦或延绳钓手术之前患者气道管理和通气的文章。手工搜索了相关参考清单。其中包括三篇有关高级气道管理的文章和五篇有关葫芦或延绳钓救援任务中高级气道管理的流行病学的文章。我们发现了一份有关提升操作期间通风的案例报告。尚不清楚HEC撤离患者之前先进气道管理的确切发生率,但似乎非常低(<?5%)。在HEC提取过程中,有几种可能会妨碍患者机械通气的危险:设备丢失,通气过度,通气不足以及随之而来的缺氧以及监测不足。在HEC操作之前很少进行高级气道管理。如果救援队考虑在直升机起重操作(HHO)和人员货物吊索(HCS)拔出之前进行插管,则应进行风险/收益分析,并定义明确的标准操作程序(SOP)。要求包括全体船员在内的持续严格的培训。在HEC提取过程中需要有关气道管理的国际注册机构。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号