首页> 外文会议>Abu Dhabi International Petroleum Exhibition Conference >What's the Difference Between Lean Construction and an Operations Science Approach to Project Delivery?
【24h】

What's the Difference Between Lean Construction and an Operations Science Approach to Project Delivery?

机译:精益建设与项目交付的运营科学方法有什么区别?

获取原文

摘要

Project Management aims to address the myriad technical, human, organizational and managerial issues encountered during project execution [1]. Over the past two decades, different variants have emerged, including Lean Project Management, Agile Project Management, Scrum, Theory of Constraints and Extreme Project Management, to name a few. Lean Construction [2,36,54] utilizes concepts originally from Lean manufacturing and applies them specifically to the delivery of projects in the construction sector. Despite the proliferation of different "flavors" of project management, major capital project outcomes in construction and in other industries remain poor [3 - 5]. Industry practitioners face a confusing array of differing methodologies, each claiming to address poor project performance. Project Production Management (PPM), based on operations science principles well-established in industrial engineering, addresses the gap between today's poor project performance and what is possible, thereby differentiating PPM from other methodologies. Here, we focus on a comparison between PPM and Lean Construction. We trace the historical evolution of Lean Construction from its roots in Lean manufacturing, highlighting the operations science foundation underlying both Lean and PPM. Lean Construction covers aspects of project governance, organization of project stakeholders and the work activities of the organization. In contrast, PPM focuses on the organization and control of project work activities. PPM's deeper focus on the execution of work activities results in quantitative, predictive outcomes, validated by practice, that address poor project execution performance.
机译:项目管理旨在解决在项目执行期间遇到的无数技术,人类,组织和管理问题[1]。在过去的二十年中,出现了不同的变体,包括精益项目管理,敏捷项目管理,Scrum,限制理论和极端项目管理,命名为几个。精益施工[2,36,54]利用最初来自精益制造的概念,并将其专门应用于建筑业的项目。尽管项目管理的不同“口味”的扩散,但建设和其他行业的主要资本项目结果仍然差[3 - 5]。行业从业者面临着令人困惑的不同方法,每个都声称解决了糟糕的项目绩效。项目生产管理(PPM)基于工业工程中成立的运营科学原则,解决了当今差的项目性能之间的差距以及可能的可能性,从而将PPM与其他方法分化。在这里,我们专注于PPM和精益建设之间的比较。我们追溯了精益建设的历史演变,在精益制造中的根源,突出了瘦益和PPM的潜在科学基金会。精益建设涵盖了项目治理,项目组织利益攸关方和本组织的工作活动方面。相比之下,PPM专注于项目工作活动的组织和控制。 PPM更深入地关注执行工作活动的执行导致通过实践验证的定量,预测结果,解决了糟糕的项目执行性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号