首页> 外文学位 >Application of Lean Construction Principles to Highway Projects: Analysis of Barriers to Timely Delivery of Service.
【24h】

Application of Lean Construction Principles to Highway Projects: Analysis of Barriers to Timely Delivery of Service.

机译:精益建设原则在公路项目中的应用:及时交付服务的障碍分析。

获取原文
获取原文并翻译 | 示例

摘要

Highway project delivery of new and reconstructed facilities in the United States is viewed to consume too much time, thereby denying the traveling public of urgently needed infrastructure. The purpose of this thesis is to gain a better understanding of current highway project delivery and suggest interventions intended to enhance time performance. The major research focus is the Highway Project Performance (HPP) Study. The HPP study examined empirical data collected from 65 projects completed by 10 public highway agencies in the Northeast and Mid-Atlantic regions of the United States. Research included determining frequency and magnitude of duration escalation and identifying the input variables of process, practices, conditions, and constraints under which typical highway projects are delivered.;Non-parametric procedures were used to test for differences among participating highway agencies. The Kruskal-Wallis and Mann-Whitney tests were employed to evaluate differences in mean TPI values for late and on time project subsets. Chi-square tests were conducted to analyze the difference in observations between the combined multi-dimensioned categories. Odds Ratio (OR) and relative risk or the risk ratio (RR) values were computed for the various categories including process and practices. Logistic regression was applied to the constraints as an additional test procedure. Semantic response differentials for each of the key performance indicators were also evaluated.;The HPP Study findings showed that approximately 66% of highway projects finish beyond the original contract duration with a mean Time Performance Index (TPI) of 0.859. Projects exposed to phased maintenance of traffic (MOT), utilities, streams or waterways, and railroads exhibit the greatest relative risk for duration escalation. Primary arterials, projects that combine bridge and roadwork, and those located in urban environments also exhibit greater relative risk of duration escalation. The relative risk of duration escalation increases exponentially with increase of project cost. Late and On Time project subsets exhibit differences in mean semantic differentials (MSD values) in constructability, the degree to which contract documents address constraints, quality and effectiveness of the contractor's schedule, and trust between the contractor and owner. These findings provide focus and motivation for owners to reduce the risk of duration escalation.
机译:在美国,高速公路项目交付的新的和重建的设施被认为浪费了太多时间,从而使旅行的公众无法获得迫切需要的基础设施。本文的目的是为了更好地了解当前的高速公路项目交付情况,并提出旨在提高时间绩效的干预措施。主要研究重点是公路项目绩效(HPP)研究。 HPP研究检查了从美国东北和中大西洋地区的10个公共公路机构完成的65个项目中收集的经验数据。研究包括确定持续时间升级的频率和幅度,以及确定交付典型公路项目的过程,实践,条件和约束的输入变量。非参数程序用于测试参与公路机构之间的差异。使用Kruskal-Wallis和Mann-Whitney检验来评估延迟和按时项目子集的平均TPI值的差异。进行卡方检验以分析组合的多维类别之间的观察差异。计算包括过程和实践在内的各种类别的赔率(OR)和相对风险或风险比(RR)值。将逻辑回归作为附加测试程序应用于约束。还评估了每个关键绩效指标的语义响应差异。HPP研究结果显示,大约66%的高速公路项目完成超出了原始合同期限,平均时间绩效指数(TPI)为0.859。受交通,公用事业,溪流,水路和铁路的阶段性维护影响的项目,其工期延长的相对风险最大。主动脉,结合桥梁和道路工程的项目以及城市环境中的动脉也显示出持续时间升级的相对风险更大。工期升级的相对风险随着项目成本的增加而呈指数增长。延迟和按时项目子集在可构造性,合同文档解决约束的程度,承包商进度表的质量和有效性以及承包商与所有者之间的信任度方面,表现出平均语义差异(MSD值)方面的差异。这些发现为业主降低工期升级风险提供了重点和动力。

著录项

  • 作者

    Muir, Robert William, Jr.;

  • 作者单位

    Drexel University.;

  • 授予单位 Drexel University.;
  • 学科 Engineering Civil.;Business Administration Management.
  • 学位 Ph.D.
  • 年度 2015
  • 页码 482 p.
  • 总页数 482
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号