首页> 外文会议>Abu Dhabi International Petroleum Exhibition Conference >Successful Application of Wireless Bottomhole Data Transmission in the UAE—Bringing Certainty During Well Test Operations
【24h】

Successful Application of Wireless Bottomhole Data Transmission in the UAE—Bringing Certainty During Well Test Operations

机译:在井测试操作中成功应用无线底孔数据传输在uAE带来确定性

获取原文

摘要

As part of ongoing efforts to develop greater gas and oil resources in the UAE, appraisal of several fields discovered decades ago accelerated in 2015 and 2016. Drill stem tests (DSTs) during appraisal are of particular importance; the production and reservoir data gathered during DSTs help determine commercial viability and support the planning of field development and facilities design. Abu Dhabi Marine Operating Company (ADMA-OPCO) was looking for a solution that allows continuous real-time monitoring and well performance evaluation and ensures that test objectives are being met, thus optimizing the test program for best operational efficiency. A wireless acoustic telemetry system was chosen and successfully deployed for the first time in several ADMA-OPCO projects to provide surface readout of bottomhole gauge data and two-way communication control of tools, such as test valves, fluid samplers, and perforating guns. With the telemetry system, bottomhole data was rendered available throughout operations, from run-in-hole to well killing operations, and was transmitted along with surface measurements to a data repository that was concurrently accessible to operating company engineers as well as the service company support personnel. The availability of real- time bottomhole pressure and temperature readings at the rig and to offsite engineers for analysis and in-time decision-making ensured that tests were executed in the safest and most efficient way while also maximizing the value of information gathered. Real-time transmission of test data enabled early diagnostic assessment of reservoir behavior and performance and identified deviations from expected responses as they developed. For example, the expected well response following matrix acid stimulation could be estimated from early prestimulation data, even when the well did not actually achieve stable flow to surface. These early diagnostic data helped to justify running stimulation operations and provided a first reasonable estimate of target rates during the main test sequences as well as the opportunity to continuously update the test plan. The data available for monitoring and initial interpretation during operations was of equal quality to that gathered by memory pressure recorders, and the use of a flexible data transmission plan focusing on key test sequences provided a descriptive capability equal to that conventionally available only after test completion. The deployment of surface readout of downhole data combined with real-time data transmission and remote support was performed for the first time in the UAE during those appraisal tests and has since become a standard practice as a result of the operational benefits achieved as well as the enhanced interpretability of data gathered.
机译:作为持续努力在阿联酋开发更大的天然气和石油资源的一部分,对几十年前发现的几个田地的评估加速了2015年和2016年。评估期间的钻杆试验(DSTS)特别重要; DSTS中收集的生产和水库数据有助于确定商业可行性并支持现场开发和设施设计的规划。阿布扎比船舶运营公司(ADMA-OPCO)正在寻找一个解决方案,可以持续实时监测和良好的性能评估,并确保正在满足测试目标,从而优化测试程序以获得最佳运行效率。在多个ADMA-OPCO项目中首次选择并成功部署了无线声学遥测系统,以提供底部仪表数据的表面读数和双向通信控制的工具,例如测试阀,流体采样器和穿孔枪。通过遥测系统,井底数据在整个操作中呈现,从漏洞到良好的杀戮操作,并与表面测量一起传输到与运营公司工程师同时访问的数据存储库以及服务公司支持人员。钻机实时井下压力和温度读数的可用性以及用于分析和时间决策的现场工程,确保了以最安全和最有效的方式执行测试,同时也会最大化收集的信息的值。测试数据的实时传输使储层行为和性能的早期诊断评估,并在其开发时确定了与预期响应的偏差。例如,可以从早期预测数据估算基质酸刺激后的预期良好反应,即使井实际上没有实现稳定的流量。这些早期诊断数据有助于证明运行刺激操作,并在主要测试序列期间提供了对目标速率的第一种合理估计,以及不断更新测试计划的机会。在操作期间可用于监测和初始解释的数据对存储器压力记录器聚集的相同质量,并且使用灵活的数据传输计划专注于关键测试序列的描述提供了等于常规可用的描述性能力。在那些评估测试期间,在UAE中首次在UAE中执行与实时数据传输和远程支持的井下数据的表面读数部署,并且由于实现的操作效益以及所实现的操作效益,因此已经成为标准练习。增强了收集的数据的解释性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号