首页> 外文会议>Asian young geotechnical engineers conference >Mid-tunnel underground docking of tunnel boring machines in Singapore
【24h】

Mid-tunnel underground docking of tunnel boring machines in Singapore

机译:新加坡隧道镗床的中间隧道地下对接

获取原文

摘要

Due to increased depth of tunneling, the time and cost involved in constructing a deep shaft is very high. In order to minimize the number of shafts and to shorten the construction period, it may be a viable option to drive TBM (Tunnel Boring Machine) from either side (of stations/portals) so they could meet midway. The TBMs could be then docked to establish a safe working chamber for concluding construction works including the TBM dismantling, internal concrete lining etc., without the need for any intermediate TBM retrieval shaft. This paper presents a case study of such TBM mid-tunnel docking performed in Singapore and also discusses details of structural design of temporary ground support system, analysis of settlement, assessment of potential impact on structures above the docking location and excavation sequencing.
机译:由于隧道的深度增加,构造深轴的时间和成本非常高。为了最小化轴的数量并缩短施工周期,它可能是从任一侧(车站/门户网站)驱动TBM(隧道镗床)的可行选择,以便它们可以在中途见面。然后,可以停靠TBMS以建立一个安全的工作室,用于结束施工工程,包括TBM拆卸,内部混凝土衬里等,而无需任何中间TBM检索轴。本文提出了在新加坡进行的这种TBM中隧道对接的案例研究,还讨论了临时地面支持系统的结构设计细节,结算分析,对对接地点上方结构的潜在影响和挖掘测序的潜在影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号