首页> 外文会议>Annual Meeting of Risk Analysis Committee of China Association for Disaster Prevention >Analysis on Benefit Risk Factors of Creative Industrial Park Based on Fuzzy Comprehensive Evaluation
【24h】

Analysis on Benefit Risk Factors of Creative Industrial Park Based on Fuzzy Comprehensive Evaluation

机译:基于模糊综合评判的创意产业园区利益风险因素分析

获取原文

摘要

The transformation and reuse of old industrial buildings as creative industry parks has become the mainstream trend. In order to prevent more companies from following blindly, this article starts from the perspective of the company and conducts an on-site inspection of the Hua Qing Science and Education Industrial Park in Shaanxi Province. The fuzzy comprehensive evaluation method is used to analyze the profitability of its operation stage, weights are determined by combination weighting method, and the risk factors that affect its effectiveness are analyzed to provide reference for the future development of creative industrial parks. The paper identifies the risk factors affecting economic efficiency mainly as its project management model; the main risk factors affecting social benefits are its ability to enhance regional image; the main risk factors affecting environmental benefits are the performance of green building operations management. Enterprises should judge their own capabilities based on relevant risk factors, and then more rationally choose the mode of space utilization for building renovation.
机译:老工业建筑的转型和重用作为创意产业园区已成为主流趋势。为了防止更多的公司盲目遵循,本文从公司的角度开始,开展了陕西省华清科学和教育工业园的现场检查。模糊综合评价方法用于分析其操作阶段的盈利能力,重量通过组合加权方法确定,分析了影响其有效性的危险因素为创意工业园区的未来发展提供了参考。本文确定了影响经济效率的风险因素,主要是其项目管理模式;影响社会效益的主要风险因素是其加强区域形象的能力;影响环境效益的主要风险因素是绿色建筑运营管理的表现。企业应根据相关风险因素判断自己的能力,然后更合理选择建筑改造的空间利用方式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号