首页> 外文会议>Euro Asia Civil Engineering Forum Conference >Traffic performance analysis of u-turn and fly over u-turn scenario; a case study at Soekarno Hatta Road, Palembang, Indonesia
【24h】

Traffic performance analysis of u-turn and fly over u-turn scenario; a case study at Soekarno Hatta Road, Palembang, Indonesia

机译:U形转弯的交通绩效分析和飞过U转向场景;印度尼西亚省皇宫哈塔路的案例研究

获取原文

摘要

On section of road often more than one U-turn median opening that operates, but sometimes this make long queue in some periods time. It's causing many factors like on- coming speed and maneuver that make waiting time. Basically, no procedure or guideline for U-turn sections design. The attempted to find the optimal approach regarding acceptances gap that occurs at U-turn median opening and the appropriate application criteria for the road that use U-turn median opening based on the capacity and traffic demand existing in the U-turn median opening. Gap acceptances influential for operational of U-turn, where the vehicle while performing maneuvers will decrease the speed of vehicles. The evaluation of the delay and travel time will provide to know the performance of the U-turn median opening. The purpose of this study is to evaluation the performance of U-turn median opening with study case at Soekarno Hatta Road, Palembang, Indonesia. The specific objectives in this study are to find the operational performance of U-turn movement by delay and travel time analysis by HCM 2000 and to evaluate the performance of U-turn using Vissim Simulation program. Vissim Simulation used for simulated 2 difference of width median opening and U-turn fly over. Simulated case study using Vissim simulation with different of width median opening showed in narrow width median opening will make major delay and the high of travel time. Based on the comparison of four scenarios of U-turn models and existing model. The best performance of U-turn facilities showed on 4th model. The 4th model is U-turn with fly over design, showed the performance are saturation degree 0.7333, delay study 3,43905, delay vissim 3,133479, and the travel time is 526,20. The travel time would lower with an increasingly the width of median opening. Simulation showed that travel time and delay slight differences when the width of median opening large than existing U-turn. Then comparison from U-turn with road median opening design and fly over U-turn design showed the last design give the best in traffic performance.
机译:在道路的一部分通常超过一个掉头的中位开口,但有时这在某个时期的时间内制造长队列。它导致许多因素,如即将到来的速度和机动,让等待时间。基本上,没有U转型部分设计的程序或指导。试图找到关于接受差距的最佳方法,这些方法发生在U转中位开放和使用基于U转中位开口处存在的容量和交通需求的路线的适当应用标准。差距接受对U形操作的影响,车辆在执行机动时的运作将降低车辆的速度。对延迟和旅行时间的评估将提供u转中位开口的性能。本研究的目的是评估U转中位开放在印度尼西亚·普拉蒙邦的Soekarno Hatta Road的研究案例的表现。本研究中的具体目标是通过HCM 2000通过延迟和旅行时间分析找到U形转向运动的操作性能,并使用VISSIM仿真程序评估U形旋转的性能。 VISSIM仿真用于模拟2宽度中值开口和U形飞行的差异。模拟案例研究采用宽度中值不同的宽度中值开口显示的瓦斯姆模拟将产生重大延迟和旅行时间。基于对U形模型和现有模型的四种场景的比较。 U形型设施的最佳性能在第4型模型上显示。第4型模型是用Fly Over设计的U形,表明性能是饱和度0.7333,延迟研究3,43905,延迟Vissim 3,13479,以及行程时间为526,20。旅行时间越来越低于中位数开口的宽度。仿真显示,当大于现有u匝的中值开口的宽度时,仿真显示出行程时间和延迟略有差异。然后从u-town与道路中间开口设计的比较并飞过u匝设计,显示最后一个设计在交通业绩中最好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号