首页> 外文会议>International Conference on Education, Management, Arts, Economics and Social Science >Evaluation model of construction site personnel management based on FAHP
【24h】

Evaluation model of construction site personnel management based on FAHP

机译:基于FAHP的施工现场人员管理评价模型

获取原文

摘要

Construction site personnel management is an important part of project management, which is an important factor in the progress of the project. According to the characteristics of the construction site, this paper establishes the evaluation index system of the construction site personnel management. Secondly, according to the problem of the test process of analytic hierarchy process (AHP) is relatively complex, the paper makes full use of fuzzy analytic hierarchy process (FAHP), and combines with the actual project construction site, and puts forward the evaluation model of personnel management.
机译:施工现场人员管理是项目管理的重要组成部分,这是项目进步的重要因素。 根据施工现场的特点,本文建立了施工现场管理的评价指标体系。 其次,根据分析层次处理(AHP)的测试过程的问题相对复杂,本文充分利用了模糊分析层次过程(FAHP),并与实际项目施工现场相结合,并提出了评估模型 人事管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号