首页> 外文会议>International Conference on Applied Science and Engineering Innovation >Bi-level decision-making approach for planning electric power systems under stochastic-interval-parameter uncertainty
【24h】

Bi-level decision-making approach for planning electric power systems under stochastic-interval-parameter uncertainty

机译:在随机间隔参数不确定性下规划电力系统的双级决策方法

获取原文

摘要

This study develops an inexact stochastic bi-level programming model (ISBPM) for planning electric power systems (EPS) under uncertainty. ISBPM is formulated based on interval-parameter programming (IPP), stochastic mathematical programming (SMP) and bi-level linear programming (BLP). In the ISBPM framework, IPP and SMP are useful in dealing with parameters expressed as interval and stochastic values, and BLP can address the Leader-Follower problem with environmental target at the upper-level and economic target at the lower-level. Then, the developed model is applied to an actual case of EPS in Fengtai District, Beijing, China. Results can provide non-compromised schemes with consideration preferences of the two decision-makers. The integrated targets of economy and environment would be also achieved.
机译:本研究开发了一个不确定性的电力系统(EPS)的不精确随机双级编程模型(ISBPM)。 ISBPM基于间隔参数编程(IPP),随机数学编程(SMP)和双级线性编程(BLP)。在ISBPM框架中,IPP和SMP可用于处理表示为间歇和随机值的参数,并且BLP可以在下层的上层和经济目标处与环境目标的引导跟随问题解决。然后,开发的模型适用于中国北京丰台区EPS的实际情况。结果可以提供两种决策者的偏好的非妥善计划。还可以实现经济和环境的综合目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号