【24h】

Santa Maria River levee ecological restoration program

机译:圣玛丽亚河堤防生态恢复计划

获取原文

摘要

The construction of an 11-kilometer levee along the Santa Maria River is to provide enhanced flood protection.The levee construction required the disturbance of 52 hectares of wildland habitat.To compensate for unavoidable impacts to sensitive ecosystems,the environmental management team at RECON designed and implemented a four-year comprehensive ecological revegetation program for the re-establishment of native riparian and upland habitats.The focus of the project was to develop a geomorphologically based mitigation approach that would restore functions and values of contiguous areas of the river system,thereby increasing the habitat value of the associated upland and riparian corridor from conditions prior to impacts.The construction of the levee,excavation of the substrate to a depth of 15 meters,and extraction of fill material (i.e.,sand) caused a substantial disturbance to the land and associated habitat,requiring rehabilitation via an adaptive revegetation program to regenerate the native ecosystem and to restore a functional river system.
机译:沿圣玛丽亚河的11公里长的堤防的建设提供增强防洪大堤protection.The建设所需的52公顷荒地的干扰,环境管理团队RECON设计habitat.To补偿不可避免的影响到敏感的生态系统和实施了为期四年的综合生态植被恢复计划重新建立该项目的原生河岸和高地habitats.The重点是开发一种能够恢复河流系统的相邻区域的功能和价值的一个geomorphologically基于缓解方法,从而提高从条件相关联的高地和河岸走廊的栖息地值之前impacts.The构造堤防的,衬底为15米的深度的挖掘,和填充材料的提取(即,砂)造成实质性的干扰的土地和相关联的栖息地,通过自适应植被方案以再生吨需要康复他原生生态系统恢复的功能水系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号