首页> 外文会议>Creative Construction Conference >A survey study on industrial construction project supply chain: on time performance and practices of structural steel and pipe spools
【24h】

A survey study on industrial construction project supply chain: on time performance and practices of structural steel and pipe spools

机译:工业建设项目供应链调查研究:关于结构钢和管道轴的时间绩效和实践

获取原文

摘要

Construction material not available for installation cause delays in the construction project supply chain and pose risks to overall project delays. Many researches have studied the supply chain to find the underlining reasons and influencing factors for project delays. Other investigations of the construction project supply chain identify ways to improve the supply chain. The purpose of this study is to determine the current state of construction project supply chain performance with a focus on material on-time availability. A survey of industrial constructors and their suppliers' on-time performance and related supply chain practices was conducted. Structural steel and pipe spools are frequently used in industrial construction projects and were selected as the subject of the survey. This survey was used to obtain a general perspective of the issues associated with the delays so that further surveys and simulations could be performed to pin point specific areas of improvement. This survey of experts in the field was used as a qualitative query to obtain opinions and a feel for the state of the practice in industrial construction supply chain management. For this initial review it is found that there are many possible delays, missing and defective parts, overall 22% for structural steel and 18% for pipe spools. New technologies such as RFID would be a possible way to improve the construction project supply chain process at this level.
机译:施工材料无法安装,延迟建设项目供应链和对整体项目延误的构成风险。许多研究已经研究了供应链,以找到项目延误的下划线原因和影响因素。建筑项目供应链的其他调查确定改善供应链的方法。本研究的目的是确定施工项目供应链绩效的当前状态,重点关注材料准时可用性。对工业构造师及其供应商的准时性能及相关供应链措施进行了调查。结构钢和管道线轴经常用于工业建筑项目,并被选为调查主题。该调查用于获得与延迟相关的问题的一般视角,以便可以对引脚特定的改进领域进行进一步的调查和模拟。该领域专家调查被用作定性查询,以获得理想和工业建筑供应链管理实践状态的意见。对于此初步审查,发现有许多可能的延迟,缺失和缺陷的部件,结构钢总计22%,管道线轴的18%。 RFID等新技术将是在此级别提高建筑项目供应链过程的可能方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号