首页> 外文会议>International Conference on Applied Energy >Optimal control of hydrokinetic-powered pumpback system for a hydropower plant in dry season: A case study
【24h】

Optimal control of hydrokinetic-powered pumpback system for a hydropower plant in dry season: A case study

机译:干旱季水电站水电站流水电供电泵浦系统的最优控制 - 以案例研究

获取原文

摘要

Low hydropower generation in dry season due to low water levels in hydropower dams is a common problem, particularly in drought-prone regions such as Southern Africa. In this paper, an optimal hydrokinetic-powered pumpback retrofit for recycling a part of the dam's downstream discharge to optimise the performance of the dam is proposed. The optimisation problem is formulated as a multi-objective problem to minimise grid pumping energy, maximise the use of hydrokinetic energy for pumping operation and maximise restoration of the dam volume through the pumpback operation. Simulation results of the proposed model using a practical case study show the potential of the model to increase the energy yield of the plant by 39 to 41.48% in the dry season.
机译:由于水电站水的低水平,干燥季节的低水电站是一个常见的问题,特别是在南非等干旱易发的地区。在本文中,提出了一种用于回收大坝的下游放电部分以优化大坝的性能的最佳水力学动力的泵送改装。优化问题被制定为多目标问题,以最大限度地减少电网泵送能量,最大限度地利用水动力能量来泵送操作并通过泵浦操作最大化坝体体积的恢复。使用实际案例研究的建议模型的仿真结果表明,该模型的潜力将植物的能量产量增加39至41.48%在干燥季节。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号