How to fit the strategy to respond to the challenges of the future overhead lines?

机译:如何符合策略来应对未来架空线的挑战?

获取原文

摘要

Projects for construction of new 400 kV high power overhead lines are facing numerous and virulent oppositions. To cope with these constraints, RTE imagined a new approach that involves stakeholders in the choice of the OHL design to be built on their territory. This process, implemented through a project of construction of a 2 circuits 400 kV overhead line in the north of France, has allowed stakeholders to choose the concept designed by HDA-Gritech. Technically, this concept is a challenge: - A single insulator string links the three phases of a same circuit on a high steel pole; - The insulator string is composed of composite insulators and specific fittings (for instance "rings" that support the conductors); - The design of the pole is similar to the one of a wind turbine; - The geometry of the structure implies the adaptation of maintenance operating procedures and the development of new tools. - The operations for live working maintenance must be modified. All these specificities have led RTE to adapt the industrial structure usually used for overhead lines construction: by working with wind turbine pole manufacturers instead of traditional tower manufacturers, working with firms used to making and controlling the mechanical design in accordance to Eurocode standards... The line will be done as a turnkey project on the basis of a European call for tender. The scope of this purchase is very large as it extends from the design of structures to the construction of the line. Taking into account the large scope of this tender and the technical challenges of the design, RTE is focusing on the robustness of the specification. Thus, further studies have been carried out to increase its reliability, particularly on the achievement of the construction and the fittings specifications. The paper presents the new approach for acceptance of the line, the new design, technical and industrial challenges to overcome to build this new 400 kV line in the north of France.
机译:建造新的400 kV高功率架空线的项目面临着众多和毒性的反对。为了应对这些约束,RTE想象一种新的方法,涉及利益相关者在选择OHL设计中建造在其领土上。这一过程通过建造法国北部的2个电路400 kV架空线的项目实施,使利益相关者选择由HDA-GRITECH设计的概念。从技术上讲,这个概念是一个挑战: - 单个绝缘体串将三个相位链接在高钢杆上; - 绝缘体串由复合绝缘子和特定配件(例如,“戒指”)构成支持导体的“环”); - 杆的设计类似于风力涡轮机之一; - 结构的几何形状意味着对维护操作程序的适应和新工具的开发。 - 必须修改实时工作维护的操作。所有这些特异性都有LED RTE以适应通常用于架空线路的工业结构建筑:通过与风力涡轮机杆制造商合作而不是传统塔制造商,与欧洲代码标准一起使用用于制造和控制机械设计的公司......这条线将根据欧洲招标作为交钥匙项目完成。此次购买的范围非常大,因为它从结构的设计延伸到线路的建设。考虑到这一招标的大范围和设计的技术挑战,RTE专注于规范的稳健性。因此,已经进行了进一步的研究以提高其可靠性,特别是在实现施工和配件规格的方面。本文介绍了接受线路,新的设计,技术和工业挑战的新方法,以克服法国北部建设这一新的400 kV线。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号