Monte Carlo Method in risk analysis for investment projects

机译:蒙特卡罗投资项目风险分析方法

获取原文

摘要

Risk assessment for environmental projects consists of studying the probability that projects will achieve a satisfactory performance for threshold-values of internal rate of return (IRR) or net present value (NPV). Risk analysis identifies and estimates risks and their level as well as measures considered to mitigate their negative impact. Quantitative risk analysis is performed for estimating the risk of the project by numeric resources. Monte Carlo simulation method can be widely applied in this area due to the advantages recognized both by practitioners and the academic community. By using this method, the distribution of all possible outcomes of an event is generated by analyzing a model several times, each time using random input values selected from the probability distributions considered normal of the components that comprise the model.
机译:环境项目的风险评估包括研究项目将达到令人满意的返回率(IRR)或净目前价值(NPV)的阈值价值的概率。 风险分析识别并估计风险及其水平以及所考虑的措施,以减轻其负面影响。 进行定量风险分析,以便通过数字资源估算项目的风险。 由于来自从业者和学术界的优势,蒙特卡罗仿真方法可以广泛应用于该领域。 通过使用该方法,通过多次分析模型来生成事件的所有可能结果的分布,每次使用从被认为是模型的组件的概率分布中选择的概率分布的随机输入值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号