A two-layer criteria evaluation approach for re-scheduling efficiently semi-automated assembly lines with high number of rush orders

机译:一种双层标准评估方法,用于重新安排高次峰值订单的半自动装配线

获取原文

摘要

Rush orders are common events in enterprises that are utilizing make-to-order production strategy. They have multiple negative impacts to the production system such as higher product defect rate which corresponds to product quality drop, not meeting the due dates and cause customers' dissatisfaction, higher production costs, waste of materials and energy. This research work studies the problem of rescheduling semi-automated assembly lines in the era of Zero Defect Manufacturing and in the face of real time events such as rush orders. This is achieved by adding to the adopted dynamic scheduling tool an extra criteria evaluation layer which is incorporating to the measured criteria the importance of each individual order. The proposed approach is validated through a real life industrial case in the semiconductor domain. The simulation results showed that incorporating the orders importance every time re-scheduling is needed can produce better schedules by 5.615%.
机译:急于订单是利用按订单生产战略的企业的常见事件。 它们对生产系统具有多种负面影响,例如更高的产品缺陷率,这对应于产品质量下降,而不是达到尽职日期,并导致客户的不满,更高的生产成本,浪费材料和能量。 本研究工作研究了在零缺陷制造时代中重新安排半自动装配线的问题,面对诸如峰值订单等实时事件。 这是通过添加到采用的动态调度工具来实现的额外标准评估层,该评估层纳入测量标准每个单独顺序的重要性。 通过半导体域中的现实生活工业案例验证了所提出的方法。 仿真结果表明,每次需要重新调度时,都可以结合命令重要性,可以产生更好的时间表5.615%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号