A two-layer criteria evaluation approach for re-scheduling efficiently semi-automated assembly lines with high number of rush orders

机译:一种双层标准评估方法,用于重新安排有效的半自动装配线,大量仓促订单

获取原文
           

摘要

Rush orders are common events in enterprises that are utilizing make-to-order production strategy. They have multiple negative impacts to the production system such as higher product defect rate which corresponds to product quality drop, not meeting the due dates and cause customers’ dissatisfaction, higher production costs, waste of materials and energy. This research work studies the problem of rescheduling semi-automated assembly lines in the era of Zero Defect Manufacturing and in the face of real time events such as rush orders. This is achieved by adding to the adopted dynamic scheduling tool an extra criteria evaluation layer which is incorporating to the measured criteria the importance of each individual order. The proposed approach is validated through a real life industrial case in the semiconductor domain. The simulation results showed that incorporating the orders importance every time re-scheduling is needed can produce better schedules by 5.615%.? 2020 The Authors, Published by Elsevier B.V.Peer review under the responsibility of the scientific committee of CIRP.
机译:急于订单是利用按订单生产战略的企业的常见事件。它们对生产系统具有多种负面影响,如更高的产品缺陷率,与产品质量下降相对应,而不是满足到期日,并导致客户的不满,更高的生产成本,浪费材料和能量。本研究工作研究了在零缺陷制造时代中重新安排半自动化装配线的问题,面对仓促订单等实时事件。这是通过添加到采用的动态调度工具来实现的额外标准评估层,该评估层纳入测量标准每个单独顺序的重要性。通过半导体结构域的现实生活工业案例验证所提出的方法。仿真结果表明,每次需要重新调度时,统一重点都可以产生更好的时间表5.615%。 2020年作者,由elsevier b.v.Peer审查的责任在CIRP科学委员会的责任下。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号