首页> 外文会议>Coiled Tubing Well Intervention Conference >Coiled Tubing Deployed Multistage Horizontal Fracturing Technology: Lesson Learned and Case History in Egypt
【24h】

Coiled Tubing Deployed Multistage Horizontal Fracturing Technology: Lesson Learned and Case History in Egypt

机译:盘绕的管道部署多级水平压裂技术:埃及的课程学习和案例历史

获取原文

摘要

Economic production from marginal reserves in mature fields has always been a major development challenge. Drilling horizontal wells and deploying coiled tubing (CT) multistage hydraulic fracturing stimulation treatments is now a proven solution for mature field development because it exposes more stimulated production zones. Khalda and Umbarka fields are two mature fields located in the Egyptian Western Desert. They are characterized by their low, depleted reservoir pressure and laminated shaley sands (Upper Bahariya formation). Their hydrocarbon reserve contents are significant. However, because of their relatively low permeability and thin layers, it is very difficult to produce economically from this formation without using hydraulic fracturing. Single-stage hydraulic fracturing treatments in vertically drilled wells resulted in a production of 25 to 40 B/D per well, which is uneconomic for field developments. Drilling horizontal wells into the best sand layer of the Upper Bahariya sand and performing seven isolated stages of hydraulic fracturing treatments by deploying CT technologies resulted in impressive production responses (1,800 B/D initial production) from this reservoir, which makes this development economical. Deploying CT to the operations exponentially improved its efficiency; seven isolated fracturing stages were performed along the lateral and more than one million lbm of proppant was pumped during three days through one single CT trip in the well. This paper provides a comprehensive description of the lessons learned from two case histories where CT fracturing techniques for multistage stimulation were applied to achieve maximum production in the field and improve the efficiency of multistage fracturing operations.
机译:成熟田地边缘储量的经济生产一直是一个重大的发展挑战。钻井水平孔和部署盘管(CT)多级液压压裂刺激治疗现在是成熟的田间开发的证明解决方案,因为它暴露了更多刺激的生产区。 Khalda和Umbarka田地是位于埃及西部沙漠的两种成熟田地。它们的特点是它们的低,耗尽的储层压力和层压的Shaley Sands(上巴拉维亚形成)。他们的碳氢化合物储备内容物很大。然而,由于它们相对较低的渗透性和薄层,因此很难在不使用液压压裂的情况下从该形成中经济地生产。垂直钻孔井的单级液压压裂处理导致每孔生产25至40b / d,这对于现场发展是不经济的。将水平井钻入上巴里雅砂的最佳砂层,通过部署CT技术进行液压压裂治疗的七个隔离阶段,导致该水库的令人印象深刻的生产响应(1,800平方公里初始生产),这使得这一发展是经济的。将CT部署到符合其效率的指数提高;沿着横向沿着横向进行左侧进行七个分离的压裂阶段,通过井中的单个CT跳闸在三天内泵送超过一百万磅的支撑剂。本文提供了从两种情况历史中学到的经验教训的综合描述,其中应用了多级刺激的CT压裂技术,以实现现场的最大产量,提高多级压裂操作的效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号