首页> 外文期刊>The Saudi Aramco journal of technology >Coiled Tubing Operational Guidelines in Conjunction with Multistage Fracturing Completions in the Tight Gas Fields of Saudi Arabia
【24h】

Coiled Tubing Operational Guidelines in Conjunction with Multistage Fracturing Completions in the Tight Gas Fields of Saudi Arabia

机译:沙特阿拉伯致密气田多级压裂完井的连续油管操作指南

获取原文
获取原文并翻译 | 示例
           

摘要

Open hole multistage fracturing completions are becoming standard practice in the southern gas fields development in Saudi Arabia, with more than 40 wells completed to date using open hole packers and selective port technology. Overall, the production results from the use of multistage fracturing completions have been very positive, and the forecast is that multistage fracturing technology usage will grow considerably over the next several years. In general, multistage fracturing completions provide an excellent advantage in that they are intervention-less in their standard mode of operation. An evolving aspect of such completions is the secondary use of coiled tubing (CT) to handle the planned and unplanned (contingency) operations occasionally required to reach well production objectives. Without optimum operational planning and the selection of correct CT downhole tools, completion problems can be encountered, and this ultimately can result in not reaching the job objective at all or only at increased costs. In addition, the use of CT to function ball-activated ports to shut-off zones or to restimulate wells is starting to be appreciated. This article presents multistage fracturing case studies where CT has been deployed, and then investigates the operational impact and productivity enhancement of CT deployment. Correlations taken from the key hardware variables, such as fracturing port size and type, motor type, mill type and CT size, are also considered and analyzed. Following the lessons learned and best practices derived from these experiences, the findings from this article, with correct implementation, should increase the potential for successful multistage completion operations and ultimate improvements in productivity. These guidelines can therefore be transferable to other operators using similar multistage fracturing completion technologies.
机译:沙特阿拉伯南部气田开发中,裸眼多级压裂完井已成为标准做法,迄今为止,已利用裸眼封隔器和选择性端口技术完成了40多口井。总体而言,使用多级压裂完井产品的生产结果非常乐观,并且预测在未来几年中多级压裂技术的使用将大大增加。通常,多级压裂完井提供了一个极好的优点,因为它们在标准操作模式下无需干预。这种完井技术的发展是二次使用连续油管(CT)来处理计划和计划外(应急)作业,这些作业有时需要达到油井生产目标。如果没有最佳的运营计划和正确的CT井下工具的选择,就可能会遇到完井问题,最终可能导致根本无法达到工作目标,或者只会增加成本。另外,开始意识到使用CT来使球形驱动的端口起作用以关闭区域或重新模拟井。本文介绍了已部署CT的多阶段压裂案例研究,然后研究了CT部署的运营影响和生产率提高。还考虑并分析了来自关键硬件变量的相关性,例如压裂口的尺寸和类型,电机类型,磨机类型和CT尺寸。遵循从这些经验中学到的教训和最佳实践之后,本文的发现以及正确的实施方法,应该会增加成功进行多阶段完井作业和最终提高生产率的潜力。因此,可以使用类似的多级压裂完井技术将这些指导原则转让给其他运营商。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号