首页> 外文会议>REET 2013 >Offshore Wind Turbines Operation and Maintenance in China: A Case Study of Donghai Bridge Offshore Wind Farm
【24h】

Offshore Wind Turbines Operation and Maintenance in China: A Case Study of Donghai Bridge Offshore Wind Farm

机译:中国海上风力涡轮机运营与维护 - 以东海桥海上风电场为例

获取原文

摘要

China has great potential in offshore wind energy and makes an ambitious target for offshore wind power development. Operation and Maintenance (O&M) of offshore wind turbines become more and more important for China wind industry. This study introduces the current offshore wind power projects in China. Donghai Bridge Offshore Demonstration Wind Farm (Donghai Bridge Project) is the first commercial offshore wind power project in China, which was connected to grid in June 2010. O&M of Donghai Bridge Project represent the state-of-the-art of China offshore O&M. During the past two and half years, O&M of Donghai Bridge Project has gone through three phases and stepped into a steady stage. It's believed that analysis of O&M of Donghai Bridge Project is very helpful for China's offshore wind power in the future.
机译:中国在海上风能中有巨大的潜力,使海上风力发展雄心勃勃的目标。海上风力涡轮机的操作和维护(O&M)对中国风业变得越来越重要。本研究介绍了中国目前的海上风电项目。东海大桥海上示范风电场(东海桥工程)是中国第一家商业海上风电项目,该项目于2010年6月与电网相连。东海桥工程的O&M代表了中国海上O&M的最先进的。在过去的两年里,东海桥工程的O&M已经经历了三个阶段,并踏入了稳定的阶段。据悉,东海桥工程的O&M的分析对未来中国的海上风电非常有帮助。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号