首页> 外文会议>Hydrovision International Conference and Exhibition >Predictive maintenance for hydropower plants safety Examples of effectiveness of a penstock pressure monitoring system
【24h】

Predictive maintenance for hydropower plants safety Examples of effectiveness of a penstock pressure monitoring system

机译:水电站的预测性维护乒乓照压力监测系统有效性的安全实例

获取原文

摘要

In 2008 EDF launched an important penstock pressure monitoring program now keeping around 250 penstocks under observation. The aim of the project is to detect any hazardous level of pressure in order to carry out appropriate action plan, but also to detect drifts of the operating conditions before they become dangerous for the facilities. A specific 3-level organization has been set up and processing or calculation tools were developed to enhance that predictive maintenance orientation. Today the program has fully proved its effectiveness with numerous cases where some predictive maintenance actions could be carried out thanks to an early detection of operating anomalies.
机译:2008年,EDF推出了一个重要的口语压力监测程序,现在在观察中保持大约250个栏。该项目的目的是检测任何危险的压力水平,以便进行适当的行动计划,也可以在对设施变得危险之前检测操作条件的漂移。已经建立了一个特定的3级组织,并开发了处理或计算工具,以增强预测性维护方向。如今,该计划充分证明了它的有效性,既由于早期检测经营异常而通过众多案例进行了众多案例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号