首页> 外文会议>International Conference on Applied Mechanics and Materials >The Thermal Stress of a Domestic 300 MW Steam Turbo Unit During Its Startup and Shutdown
【24h】

The Thermal Stress of a Domestic 300 MW Steam Turbo Unit During Its Startup and Shutdown

机译:在其启动和关机期间,国产300 MW蒸汽涡轮机的热应力

获取原文

摘要

The simulation system on the thermal stress of the rotor during startup & shutdown for a domestic 300 MW steam turbo unit, by the simulation, the surface of the shaft was suffered a crushing stress, but it was a pulling stress when a unit shutdown. The max thermal stress & the max combined stress produced on the rotor of a medium pressure cylinder was about 16% bigger than those on the rotor of the high pressure cylinder when they had the same increase rate of temperature. When thought from economics & safety, the optimal temperature-increase-rate of the rotor was 1.6°C/min when the unit startup at cold state, but it was 1. 8°C/min when started up and shut down the unit at hot state, it's optimal for slipping-parameter and the optimal temperature-decease-rate of the rotor was 0.85°C/min.
机译:通过模拟,通过模拟,仿真在突出的磨削应力时,仿真和关闭在旋转的转子期间的仿真系统,但是当单位关闭时,轴的表面遭受碎裂的应力,但是它是拉伸应力。当它们具有相同的温度速率时,在中压滚筒的转子上产生的最大热应力和最大组合应力大约比高压缸的转子上大约16%。从经济学和安全性思考时,当寒冷状态的单位启动时,转子的最佳温度 - 增加率为1.6°C / min,但在启动时为1. 8°C / min并关闭设备热状态,滑动参数最佳,转子的最佳温度去速率为0.85℃/ min。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号