首页> 外国专利> AUXILIARY STEAM PIPELINE FOR AUTONOMOUS STARTING OF UNIT ENGINE POWER 300 MW

AUXILIARY STEAM PIPELINE FOR AUTONOMOUS STARTING OF UNIT ENGINE POWER 300 MW

机译:自动启动300兆瓦机组动力的辅助蒸汽管道

摘要

Patent application refers to auxiliary steam pipelines for autonomous starting of 300MW power block in thermo electric power plant Nikola Tesla Obrenovac. Starting these blocks depends on operation of some other block for power supply of auxiliary steam of appropriate quality, primarily by steam for sealing turbine parts, which are initially under vacuum pressure. In case of simultaneous delay of all blocks, the starting is possible upon starting one of two blocks of engine power of 200MW which is risky for several reasons. Alternative to this is building in of auxiliary boiler house, which is as a standard approach, uneconomical. Building-in auxiliary steam pipeline, which couples boiler outlet inter-overheater (4) and turbine sealing system, solves this problem. For all this, inter-overheater (4) of boiler is maintained under pressure of 6 bar (no steam circulation), and by coupling two beams (3) of outlet inter-overheater (4) in series, even desirable temperature can be achieved around 300°C, by means of this is obtained high-quality auxiliary steam for sealing turbine (13) and also for the needs of some other consumers at starting the block, in this case - from proper sources.;Prijava patenta se odnosi na pomone parovode za autonomno startovanje bloka snage 300 MW u TENT-A Obrenovac. Startovanje ovih blokova je uslovljeno radom nekog drugog bloka radi snabdevanja pomonom parom odgovarajueg kvaliteta, prvenstveno parom za zaptivanje delova turbine koji su u startu pod vakuumskim pritiskom. U sluaju istovremenog zastoja svih blokova pokretanje je mogue po startu jednog od dva bloka snage 200 MW to je, iz vie razloga, riskantno. Alterntiva ovome je izgradnja pomone kotlarnice to je, kao klasian pristup, neracionalno. Ugradnjom pomonog parovoda koji spaja izlazni medjupregreja (4) kotla i sistem zaptivanja turbine ovaj problem se reava. Pri tome, medjupregreja (4) kotla se odrava pod pritiskom od 6 bar (bez cirkulacije pare), a povezianjem dva snopa (3) izlaznog medjupregrejaa (4) u serijski niz, moe se postii i poeljna temperatura oko 300В°C, ime se dobija kvalitetna pomona para za zaptivanje turbine (13) i za potrebe nekih drugih potroaa pri startovanju bloka, u ovom sluaju - iz sopstvenog izvora.[Patent application refers to auxiliary steam pipelines for autonomous starting of 300MW power block in thermo electric power plant Nikola Tesla Obrenovac. Starting these blocks depends on operation of some other block for power supply of auxiliary steam of appropriate quality, primarily by steam for sealing turbine parts, which are initially under vacuum pressure. In case of simultaneous delay of all blocks, the starting is possible upon starting one of two blocks of engine power of 200MW which is risky for several reasons. Alternative to this is building in of auxiliary boiler house, which is as a standard approach, uneconomical. Building-in auxiliary steam pipeline, which couples boiler outlet inter-overheater (4) and turbine sealing system, solves this problem. For all this, inter-overheater (4) of boiler is maintained under pressure of 6 bar (no steam circulation), and by coupling two beams (3) of outlet inter-overheater (4) in series, even desirable temperature can be achieved around 300В°C, by means of this is obtained high-quality auxiliary steam for sealing turbine (13) and also for the needs of some other consumers at starting the block, in this case - from proper sources.
机译:专利申请涉及热电厂Nikola Tesla Obrenovac中用于自动启动300MW功率块的辅助蒸汽管道。启动这些模块取决于其他模块的运行,以提供适当质量的辅助蒸汽,主要是通过密封最初处于真空压力下的涡轮机部件的蒸汽。在所有模块同时延迟的情况下,可以在启动200MW发动机功率的两个模块之一时启动,这有很多原因,这是有风险的。替代方案是在辅助锅炉房中建房,这是一种标准方法,不经济。内置的辅助蒸汽管道解决了这个问题,该管道将锅炉出口过热器(4)和涡轮机密封系统耦合在一起。为此,锅炉的过热器(4)保持在6 bar的压力下(无蒸汽循环),并且通过串联耦合出口过热器(4)的两根梁(3),甚至可以达到理想的温度在大约300°C的温度下,由此获得了高质量的辅助蒸汽,用于密封涡轮(13),也满足了一些其他消费者在启动该模块时的需要-在这种情况下-来自适当的来源。; Prijava patenta se odnosi na Pomone parovode za autonomno startovanje bloka snage 300 MW u TENT-A Obrenovac。 Startovanje ovih blokova je uslovljeno radom nekog drugog bloka radi snabdevanja pomonom parom odgovarajueg kvaliteta,prvenstveno parom za zaptivanje delovaturbo koji su u startu pod vakuumskim pritiskom。 U sluaju istovremenog zastoja svih blokova pokretanje je mogue po startu jednog od dva bloka snage 200 MW to je,iz vie razloga,Riskantno阿尔特沃蒂瓦·奥沃姆·耶·伊斯格勒贾·波蒙·科塔拉尼采对杰的信,考拉斯·普里斯图普,neracionalno。 Ugradnjom pomonog parovoda koji spaja izlazni medjupregreja(4)kotla i sistem zaptivanja涡轮ovaj问题se reava。 Pri tome,medjupregreja(4)kotla se odrava pod pritiskom od 6 bar(bez cirkulacije pare),povezianjem dva snopa(3)izlaznog medjupregrejaa(4)u serijski niz,moe se postii i poeljnatempatura oko 300 dobija kvalitetna pomona para za zaptivanje汽轮机(13)专利申请涉及热电厂尼古拉·特斯拉的300MW功率块自动启动的辅助蒸汽管道。奥伯诺瓦茨。启动这些模块取决于其他模块的运行,以提供适当质量的辅助蒸汽,主要是通过密封最初处于真空压力下的涡轮机部件的蒸汽。在所有模块同时延迟的情况下,可以在启动200MW发动机功率的两个模块之一时启动,这有很多原因,这是有风险的。替代方案是在辅助锅炉房中建房,这是一种标准方法,不经济。内置的辅助蒸汽管道解决了这个问题,该管道将锅炉出口过热器(4)和涡轮机密封系统耦合在一起。为此,锅炉的过热器(4)保持在6 bar的压力下(无蒸汽循环),并且通过串联耦合出口过热器(4)的两根梁(3),甚至可以达到理想的温度在大约300°C的温度下,由此获得的高质量辅助蒸汽可用于密封涡轮机(13),也可满足其他一些消费者在启动该模块时的需求,在这种情况下,可通过适当的渠道获得。

著录项

  • 公开/公告号YU81702A

    专利类型

  • 公开/公告日2004-11-25

    原文格式PDF

  • 申请/专利权人 TEOFILOVIC RADOVAN;

    申请/专利号YU2002P000817

  • 发明设计人 TEOFILOVIC RADOVAN;

    申请日2002-11-01

  • 分类号

  • 国家 YU

  • 入库时间 2022-08-21 22:16:12

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号