首页> 外文会议>International Conference onechatronics, Robotics and Automation >Study on Optimal Scheduling Methods of Urban Drainage Pumping Stations Based on Orthogonal Test
【24h】

Study on Optimal Scheduling Methods of Urban Drainage Pumping Stations Based on Orthogonal Test

机译:基于正交试验的城市排水泵站最优调度方法研究

获取原文

摘要

An optimal scheduling method of urban pumping stations was proposed to cut down the energy cost. Using this method, pumping stations in the drainage area were divided into groups, and the scheduling period was divided into several computation periods, and several operation schemes were fixed in each group. In each computation period, groups were regarded as test objects, and operation schemes as test levels, and scientific tests were carried out with the help of orthogonal test table. Choosing the ratio of drainage volume and power consumption as the objective function, the best theoretical operation scheme should be found out through the orthogonal analysis. Using the unsteady flow model to calculate each river water level, and if each river water level was within the allowable variation amplitude, then the scheme was optimal and feasible; otherwise, adjust the test level according to the main-to-secondary sequence to obtain the optimal operation scheme. Taking 20-year frequency storm in one region of Shanghai city as a study case, total electric power consumption could be reduced more than 1/4 with the optimal scheduling method compared with the traditional one.
机译:提出了城市泵站的最佳调度方法,减少了能源成本。使用这种方法,排水区中的泵站被分成基团,并将调度周期分成多个计算周期,并且在每个组中修复了几种操作方案。在每个计算周期中,组被视为测试对象,以及在正交测试表的帮助下执行操作方案和科学测试。选择排水量和功耗作为目标函数的比率,应通过正交分析发现最佳理论操作方案。使用不稳定的流模型来计算每个河水水平,如果每个河水水位在允许的变化幅度内,那么该方案是最佳的和可行的;否则,根据主级序列调整测试水平以获得最佳操作方案。在上海市一个地区为一个研究案例,在上海市一个地区进行20年的频率风暴,与传统的调度方法相比,总电力消耗可以减少超过1/4。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号