首页> 外文会议>International Conference onechatronics, Robotics and Automation >Study on Trackless Tyred Vehicle Intelligent Scheduling System Base on Time Response
【24h】

Study on Trackless Tyred Vehicle Intelligent Scheduling System Base on Time Response

机译:基于时间响应的无轨Tyred车辆智能调度系统研究

获取原文

摘要

According to traffic jam problem in the tunnel, we study and design an analysis method of roadway transportation line which is suited of trackless tyred vehicle system underground coal mine, Through detailed analysis for traffic jam problem by trackless tyred vehicle in the tunnel, we designed automatic control algorithm for trackless tyred vehicle haulage system underground coal mine and designed the intelligent scheduling system, and solved the trackless tyred vehicle's traffic problems.
机译:根据隧道的交通堵塞问题,我们研究和设计道路运输线的分析方法,该方法适用于无轨道的Tyred车辆系统地下煤矿,通过对隧道中无轨道的Tyred车辆进行交通堵塞问题的详细分析控制算法轨道地下煤矿地下煤矿,设计智能调度系统,解决了无轨道的Tyred车辆的交通问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号