首页> 外文会议>NATC North Africa Technical Conference >Application of a Numerical Simulation Model for Work over Plans Assessment Prior Operations and Determination of Best Well Intervention Technique for Production Enhancement
【24h】

Application of a Numerical Simulation Model for Work over Plans Assessment Prior Operations and Determination of Best Well Intervention Technique for Production Enhancement

机译:数值模拟模型在计划评估工作中的应用及生产增强的最佳井干预技术的研究

获取原文

摘要

This paper describes the application of a new numerical model to simulate any work over plans in order to assess the work over efficiency and the well productivity enhancement, prior to operations commencement. A case study is discussed, where an operator in Egypt had a plan to improve the productivity of an oil well producing from a multi-layer reservoir, where a low productivity layer had been previously identified and characterized by multiple techniques. It was critical for the operator to enhance the productivity across this layer and to identify the appropriate remedial action (water shut off, re-perforate, or stimulation) that could impact the whole field production performance. The operator had decided to re-perforate and add new perforations to the low productivity layer. The numerical simulation model was hence applied to assess work over techniques and to determine the most suitable remedial action for implementation. The simulation result of reperforation and adding new perforations showed water cut drop by 6% with an increase in oil rate by 538 b/d and in water rate by 348 b/d compared to the initial profile identified by production logging. The result of the numerical simulation model suggests that the low productivity layer should be considered as a candidate for stimulation (fracturing/acidizing). When the operator attempted to re-perforate the low productivity layer, the production performance after the reperforation did not show a major improvement, as the water cut decreased by 6% only with a small gain in oil rate, which is in agreement with the simulation model outcome. The operator understood the reason for the field wide low productivity from this layer and hence obtained a key to unlocking the reserves contained in this layer across the whole field in future field development plans.
机译:本文介绍一种新的数值模型的应用来模拟,以评估在效率操作开始之前的工作和良好的生产率提高,超过计划的任何工作。为例进行了讨论,其中在埃及的操作者不得不提高油井从多层水库,其中的低生产率层先前已经鉴定和表征通过多种技术制造生产率的计划。这是至关重要的运营商,以加强整个这一层的生产力,并确定适当的补救措施(水关闭,重新穿孔,或刺激)可能影响整场生产性能。运营商已经决定重新穿孔,并添加新的穿孔生产率低层。数值模拟模型,因此施加到评估工作过的技术和以确定用于执行最适合的补救措施。补孔和增加新的穿孔的仿真结果表明含水下降6%与538 B / d的增大油率和由348 B / d水率相比,生产测井标识的初始轮廓。数值模拟模型的结果表明,低生产率层应被视为用于刺激的候选(压裂/酸化)。当操作员尝试重新穿孔低生产率层中,补孔后的生产性能并没有表​​现出重大的改进,如含水率只有在油率小幅增长,​​这是协议与模拟下降了6%模型结果。运算符可以理解的领域具有广泛的生产效率低的原因,从该层,从而获得一键解锁包含在未来领域的发展计划在整个领域的这层储量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号