West Gully Upper - innovative rockfall and debris flow protection systems

机译:西沟壑上部创新岩石和碎片流动保护系统

获取原文

摘要

Within PT Freeport Indonesia's (PTFI) mining operation in Papua, Indonesia the Mill Area complex is subject to rockfall and debris flow events which initiate from a source area approximately 1,000 m up in a steep gully known as the 'West Gully'. Active barrier protection systems, RXI-500 (5,000 kJ) barrier, were installed to reduce likelihood of these geohazards impacting the Mill Area. However, during August 2011 an estimated 45,000 m3 failure event occurred from the West Gully Upper source area due to differential erosion and the sites tectonic setting. The mass and velocity of this failure easily exceeded the capacity of the two RX-500 barriers located in the lower section of the gully. The failure event caused significant damage and economic interruption to the Mill Area complex and blocked the critical transport corridor (Ridwan Napitupulu Road).Following a site visit Geovert provided an options report and formally recommended increasing the overall capacity of the rockfall/debris flow protection system for the West Gully by significantly increasing individual barrier capacity from 5,000 to 8,000 kl. PTFI as a true industry innovator committed to the GBE-8000A system prior to public knowledge of its existence and prior to the system achieving certification at the Swiss Governmental testing facility in Walenstadt. Certification was later achieved at Walenstadt in October 2011. Free Fall Geotechnical Engineering ZT GmbH modelled rockfall and debris flow anticipated trajectories and impact forces for the West Gully protection system. This modelling supported recommendations to increase the protection system capacity utilising GBE-8000A barrier technology. Rockfall 7.1 beta, by Dr. Spang Ltd, modelling confirmed 3 locations for GBE-8000A barriers to suitability retain rockfall and debris flow events in the West Gully. The proposal included provision for installation of temporary protection works to protect against geohazards while constructing barrier's in the West Gully and contingency planning to allow for safe repair works of barrier systems if a major failure event occurs. Climatic, environmental and physical conditions were critical in pre-construction planning and during construction execution to compensate for; frequent heavy bursts of precipitation (estimated at 11 m/yr at the Mill Area complex), consideration of the project site situated at approximately 3,600 masl and no road access to the site resulting in complete reliance on tailored Helicopter transportation of all personnel, equipment and materials to site.
机译:在PT自由港印度尼西亚(PTFI)在巴布亚的矿业运营中,印度尼西亚磨坊区综合体受到岩石和碎片流动事件,从源区发起大约1,000米,陡峭地称为“西沟壑”。安装了主动屏障保护系统,RXI-500(5,000千克)屏障安装,以减少这些地质锯齿的可能性影响磨坊地区。然而,2011年8月期间,由于差异侵蚀和网站构造环境,估计从西沟地源极面积发生估计的45,000 M3故障事件。这种故障的质量和速度容易超过位于GULLY下部的两个RX-500屏障的容量。失败事件对轧机地区复杂引起了重大的损害和经济中断,并阻止了临界运输走廊(Ridwan Napitupulu Road)。选择一个网站访问Geovert提供了一个选项报告,并正式推荐增加岩石/碎片流动保护系统的整体容量对于西部沟壑,通过5,000至8,000 kL的个人屏障容量显着增加。 PTFI作为一个真正的行业创新者,在公共知识之前致力于GBE-8000A系统,并在制度在瑞士政府检测设施在Walenstadt的认证之前。 2011年10月,Walenstadt的认证后来获得。自由落体岩土工程ZT GmbH模型岩石和碎片流量预期的轨迹和西沟保护系统的冲击力。这种建模支持建议,以利用GBE-8000A屏障技术提高保护系统能力。洛杉矶7.1 Beta,由Spang Ltd博士,建模确认了GBE-8000A障碍的3个地点适用于西部沟壑的岩石和泥石流事件。该提案包括安装临时保护的规定,以防止地质蹂躏,同时构建西部沟壑的障碍和应急计划,以便如果发生重大失败事件,允许安全修复障碍系统的安全修复作品。气候,环境和物理条件在预制规划和施工执行期间以弥补;频繁的沉淀突​​发(估计在Mill Area Complex的11米/年),考虑到占地约3,600马斯尔的项目现场,没有道路访问本地,导致所有人员,设备和设备的量身定制直升机运输完全依赖。材料到现场。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号