The Forth Road Bridge was officially opened in 1964 and was estimated to have cost, with surrounding infrastructure, around £19.5 million (£322 million in the current climate). Initially, a design life of 120 years was predicted for the structure, with replacement of the main cable suspender ropes set at 35 year intervals. However, an inspection performed on the main cables in 2004 identified corroded wire strands, which reduced the expected life estimation. The conclusion was that load restrictions would be required as early as 2017. Since the first inspection, two subsequent cable investigations were carried out in 2008 and 2012. Although bridge inspections are common place in the US and now becoming more widespread in the UK, some elements of wire failure are still considered a complex phenomenon. The process of fracture initiation and final failure are understood but arguments still exist concerning the exact mechanism of propagation. This study communicates some of the findings from the 2012 metallurgical cable inspection performed by ESR Technology and provides a brief discussion on failure mechanisms.
机译:第四座桥于1964年正式开业,估计有成本,周围基础设施,约为1950万英镑(目前的气候3.22亿英镑)。最初,预计该结构的设计寿命为120年,用35年间隔设定的主要电缆吊带绳索替换。然而,在2004年在2004年主电缆上进行的检查鉴定了腐蚀线股,减少了预期的寿命估计。结论是,早在2017年就需要负载限制。自第一次检查以来,2008年和2012年进行了两次后续电缆调查。虽然桥梁检查在美国是普通的地方,现在在英国变得更加普遍。电线故障的元素仍被认为是复杂的现象。骨折启动和最终失败的过程应理解,但是关于传播的确切机制仍然存在争论。本研究通过ESR技术执行的2012年冶金电缆检查中的一些结果传达了一些结果,并介绍了关于失效机制的简要讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号