...
首页> 外文期刊>Wire rope news and sling technology >The mystery of suspension bridge cable corrosion and the Forth Road Bridge's solution
【24h】

The mystery of suspension bridge cable corrosion and the Forth Road Bridge's solution

机译:悬索桥电缆腐蚀的谜团和第四路桥梁解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

In order to investigate a new technique of cable corrosion mitigation that was just being undertaken,National Geographic's World's Tough-est Fixes host Sean Riley visited the Forth Road Bridge located in South Queensferry,Scotland. (The show aired in May 2010.)Riley's job was to help tie Ethernet wire to cables while hanging some 300 feet above the bridge's road deck. The wires went from cable monitors down to a computer below that would help engineers know when a wire in one of the two main cables of the bridge had broken. As a master rigger,Riley enjoys the feel of the “air under my feet,swinging in the breeze,” and this is a job that not too many people in the world could tackle.
机译:为了研究刚刚采取的减轻电缆腐蚀的新技术,《国家地理》杂志《世界最艰难的修复》节目主持人肖恩·赖利参观了位于苏格兰南昆斯费里的福斯路大桥。 (该节目于2010年5月播出。)Riley的工作是帮助将以太网线绑在电缆上,同时将其悬挂在桥的道路甲板上方约300英尺处。电线从电缆监控器向下延伸到下方的计算机,这将帮助工程师了解桥的两条主要电缆之一中的电线何时断开。作为熟练的装备工,Riley感到“脚下的空气,微风中摇摆”的感觉,这是世界上没有太多人可以解决的工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号