首页> 外文会议>International Conference on Complexity Science and Information Engineering >On reasons of uncontrollable construction cost based on the ABC analysis method and the complete decomposition model
【24h】

On reasons of uncontrollable construction cost based on the ABC analysis method and the complete decomposition model

机译:基于ABC分析方法和完整分解模型的无法控制施工成本的原因

获取原文

摘要

In view of the previous studies on uncontrollable construction cost, which mostly were based on the practical experiences and subjective speculating, the conclusions were empirical and lack of data support. In order to solve this problem, the quantitative analysis methods are introduced here. The application of ABC analysis method can distinguish the minor-key factors from tremendous factors which influence the cost changes. And the complete decomposition of construction cost changes can decompose the main effects of the cost changes to define the key effects. Through applying these two methods, the construction cost can be controlled by mainly controlling the key factors and effects of the projects. Besides, project data of uncontrollable construction cost can be accumulated to provide objective and scientific suggestions on controlling cost. A completed small civil engineering is presented as an example.
机译:鉴于以前关于无法控制的建筑成本的研究,主要是基于实际经验和主观推测,结论是经验和缺乏数据支持。为了解决这个问题,这里介绍了定量分析方法。 ABC分析方法的应用可以区分影响成本变化的巨大因素的次要因素。并且建设成本的完全分解变化可以分解成本变化的主要影响来定义关键效果。通过应用这两种方法,可以通过主要控制项目的关键因素和影响来控制施工成本。此外,可以累积无法控制的建筑成本的项目数据,以提供对控制成本的客观和科学建议。作为一个例子,提出了完整的小型土木工程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号