首页> 美国政府科技报告 >Design/Build versus Traditional Construction User Delay Modeling: An Evaluation of the Cost Effectiveness of Innovative Construction Methods for New Construction. Part 1. I-15 Reconstruction in Davis County. Evaluation of Various Traffic Maintenance P
【24h】

Design/Build versus Traditional Construction User Delay Modeling: An Evaluation of the Cost Effectiveness of Innovative Construction Methods for New Construction. Part 1. I-15 Reconstruction in Davis County. Evaluation of Various Traffic Maintenance P

机译:设计/建造与传统建筑用户延迟建模:新建筑创新施工方法成本效益评估。第1部分。在戴维斯县的I-15重建。各种交通维护的评估p

获取原文

摘要

This paper evaluates impact of various I-15 reconstruction closure scenarios on the travelers in Ogden area. The purpose of the research was to investigate impact of the scenarios and facilitate decision about future maintenance of traffic during the reconstruction. The original Wasatch Front Regional Council (WFRC) transportation planning model was converted from the TP+ software to the VISUM software. The VISUM model of the whole WFRC area was then calibrated and validated. Coefficient of determination between modeled and observed traffic volumes was 0.78. The model was then reduced, by partial network generation process in VISIM, to the Ogden area. Another set of calibration and validation was performed. The coefficient of determination has improved to 0.88. Twenty one reconstruction closure scenarios were developed in consultation with UDOT project managers. Traffic assignments were executed for each scenario for five diurnal periods.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号