首页> 外文会议>International Production and Operations Conference and Exhibition >Brownfield Project Interface with Operating Facilities without Impacting Schedule HSE Compliance
【24h】

Brownfield Project Interface with Operating Facilities without Impacting Schedule HSE Compliance

机译:Brownfield项目界面与运营设施而不影响Schedule&HSE合规性

获取原文

摘要

Brownfield Projects (i.e Projects involving Execution within or associated with Operational Process Plants) provide unique challenges for compliance to Health, Safety and Environmental (HSE) Regulations everywhere in the world. While HSE Compliance is essential and mandatory, the associated procedures are often tedious and time consuming; even overwhelming the Operations personnel and adversely impacting project schedules. One such project is the Gas Sweetening Facilities (GSF) Project, consisting of one Acid Gas Recovery Unit (AGRU) inside the ARAB-D Plant at DUKHAN and one Sulfur Recovery Unit (SRU) inside the NGL Facilities at MESAIEED. This Paper highlights the measures taken at the AGRU to meet the apparently conflicting requirements of HSE Compliance and SCHEDULE Compliance.
机译:Brownfield项目(即涉及在运营过程工厂的执行的项目)为世界各地的健康,安全和环境(HSE)法规提供了独特的挑战。虽然HSE合规是必不可少的和强制性的,但相关程序通常繁琐且耗时;甚至压倒了运营人员,并对项目时间表产生了不利影响。其中一个项目是煤气甜化设施(GSF)项目,由Dukhan的阿拉伯和Amgr恢复单位(SRU)内的一个酸气回收单位(Agru)组成,位于梅西地的NGL设施内。本文重点介绍了Agru采取的措施,以满足HSE合规性和安排遵守的明显相互冲突。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号