首页> 外文会议>International Conference on Civil Engineering, Architecture and Sustainable Infrastructure >Analyze the Impact of the Thin-walled Hollow Pier by Construction of Reservoir
【24h】

Analyze the Impact of the Thin-walled Hollow Pier by Construction of Reservoir

机译:储层施工分析薄壁空心墩的影响

获取原文

摘要

The river dam intends to build at 280 m downstream of a built bridge. This paper, using ANSYS finite element software, establishes a rational and realistic model to analyze the influence of the reservoir construction on the thin-walled hollow pier of built bridge. The variation of the stress of the bridge thin-walled hollow pier before and after impounding of the reservoir is given out, which can be as a guidance for future reinforcing the thin-walled hollow pier.
机译:河坝打算在建造桥下的下游280米。 本文采用ANSYS有限元软件建立了一个理性和现实模型,分析了水库建设对建造桥梁薄壁空心码头的影响。 给出了储存器的蓄积前后桥梁薄壁空心墩的应力的变化,这可以是未来加强薄壁空心码头的指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号