Numerical Simulation Analysis of Tailings Dam Heightening Expansion Stability

机译:尾矿坝高压膨胀稳定性的数值模拟分析

获取原文

摘要

Xinchang tailings dam is used as an object and the software named Slide is utilized to operate numerical simulation, and then the three conditions (normal operating mode, flood conditions, the special conditions) of tailings dam are analyzed to determine the stability. The conclusions are as follows: tailings dam have been built to 80m height, both to meet regulatory requirements, so the dam is stable; but if continue to increase the height to 85m, tailings dam stability coefficient reduced to special conditions 1.032, less than the standard value 1.05, does not meet the national regulatory requirements, the maximum limit of a height of about 80m.
机译:新昌尾矿大坝用作物体,并使用名为幻灯片的软件来运行数值模拟,然后分析尾矿坝的三种条件(正常运行模式,洪水条件,特殊条件)以确定稳定性。结论如下:尾矿大坝已经建成了80米的高度,无论是满足监管要求,所以大坝稳定;但是,如果继续将高度增加到85米,尾矿坝稳定系数减少到特殊条件1.032,小于标准值1.05,不符合国家监管要求,最高限额约为80米。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号