首页> 外文会议>Society of Petroleum Engineers Intelligent Energy International Conference >Methodology For Overcoming Bottlenecks Leading To Successful Implementation of Collaborative Working Environment
【24h】

Methodology For Overcoming Bottlenecks Leading To Successful Implementation of Collaborative Working Environment

机译:克服瓶颈的方法,导致成功实施协作工作环境

获取原文

摘要

While many papers talk about the benefits of Collaborative Work Environments (CWE), few have addressed the issues related to the design and implementation of the projects. This paper covers the development of the NEB field CWE in Abu Dhabi Oil Company for Onshore Operations (ADCO), and addresses the experiences and learnings across all phases of the project. It addresses the development of the Smart Fields strategy and the planned coverage of CWEs across the producing field, the required IT infrastructure, the selection of applications and the development of workflows to support the CWEs and the significant project management and logistical challenges. During the course of the project ADCO underwent a reorganization which aligned the company around its producing assets. The paper addresses the benefits that this change has made in implementing the CWE programme and highlights some of the change management issues faced by the team. Critical to the success of the project was to ensure staff quickly familiarized themselves with the new working environment and that a clear support structure was in place which could respond to technical problems and requests for assistance. A key purpose of the paper is to share the acquired knowledge from implementing the project, covering both the successes and the challenges of overcoming bottlenecks, pitfalls and things that simply go wrong. In such, it provides the leadership practitioner with a balanced methodology of process and necessary soft skills to map out a road which manages the risks and avoids the potholes.
机译:虽然许多论文谈论协作工作环境的好处(CWE),但很少有人解决了与项目的设计和实施有关的问题。本文涵盖了在阿布扎比石油公司的NEB领域CWE的开发,用于船体运营(ADCO),并解决项目各阶段的经验和学习。它解决了智能领域战略的发展和跨越生产领域的CWE计划的计划覆盖,所需的IT基础设施,选择的应用和工作流程的开发,以支持CWE和重大的项目管理和后勤挑战。在项目过程中,ADCO经历了重组,将公司与其生产资产保持一致。本文讨论了这种变革在实施CWE计划方面取得的好处,并突出了团队面临的一些变更管理问题。对项目的成功至关重要是为了确保员工迅速熟悉新的工作环境,并解决了明确的支持结构,这可能会响应技术问题和援助要求。本文的一个关键目的是分享从实施项目的获得知识,涵盖克服瓶颈,陷阱和事物的成功和挑战。在这样的情况下,它为领导执业者提供了平衡的过程和必要软技能的方法,以映射管理风险并避免坑洼的道路。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号