首页> 外文会议>POWER-GEN Europe Conference and Exhibition >Session 7: The Scandinavian Green Way - CHP - Energy Efficiency Session date: 11/6/2015
【24h】

Session 7: The Scandinavian Green Way - CHP - Energy Efficiency Session date: 11/6/2015

机译:第7届:斯堪的纳维亚绿色方式 - CHP - 能源效率会议日期:11/6/2015

获取原文
获取外文期刊封面目录资料

摘要

Combined heat and power (CHP) production is one way to utilize the fuel energy most optimized way. There are additional procedures and concepts how CHP plant efficiency and energy economics can be further improved. Heat recovery from flue gases by using flue gas condensing (FGC) technology, with or without combustion air humidifier (CAH) or heat pump (feasibility of such depends on process parameters), is a practical solution to increase district heating (DH) capacity. Technology can be installed in an existing power plant or to a green field plant in order to further optimize the whole CHP plant solution. Naturally flue gas condensers decrease emissions, and different design aspects and targets can be taken into account in design. This paper will introduce the main technological variations of flue gas condensers and also practical experiences of two selected cases. The first case is a power plant (boiler size 69 MWth) in Southern Finland and it has been in operation since early 2012. A tube type flue gas condenser and a combustion air humidifier were built together with the power plant. Last year further optimization for flue gas condensing operating principles were done, and that has yielded promising results. The second case is a power plant (boiler size 73 MWth) also in Finland and it has been in operation since 1995. A scrubber type flue gas condenser and a combustion air humidifier were retrofitted to an existing plant in autumn 2014. Installation was executed in 9 months and it required no extra downtime for boiler.
机译:综合发热和功率(CHP)生产是利用燃料能量最优化的方式的一种方式。有额外的程序和概念如何进一步改善CHP工厂效率和能量经济学。通过使用烟气冷凝(FGC)技术,有或没有燃烧空气加湿器(CAH)或热泵(即将采用工艺参数的可行性),从烟气冷凝(FGC)技术从烟道气中加热回收来自燃烧空气加湿器(CAH)的可行性,是增加地区供暖(DH)容量的实用解决方案。技术可以安装在现有的电厂或绿地工厂中,以进一步优化整个CHP植物溶液。当然烟气冷凝器减少排放,并且可以在设计中考虑不同的设计方面和目标。本文将介绍烟气冷凝器的主要技术变化,也是两种选定病例的实际经验。第一种情况是芬兰南部的电厂(锅炉大小69 MWTH),自2012年初以来一直在运行。管式烟气冷凝器和燃烧空气加湿器与电厂建立。去年进行了烟气冷凝操作原理的进一步优化,并产生了有希望的结果。第二种情况是芬兰的发电厂(锅炉大小73 MWTH),自1995年以来一直在运行。洗涤器型烟气冷凝器和燃烧空气加湿器在2014年秋季改装到现有的植物。安装是执行的9个月,它无需为锅炉提供额外的停机时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号