首页> 外文会议>IABSE conference >I-90 Track Bridge – Development and Implementation of a System to Carry Light Rail Vehicles on to a Floating Bridge
【24h】

I-90 Track Bridge – Development and Implementation of a System to Carry Light Rail Vehicles on to a Floating Bridge

机译:I-90轨道桥梁 - 开发和实施系统,将轻轨车辆携带到浮桥上

获取原文

摘要

The Central Puget Sound Region’s transit agency, Sound Transit (ST), is planning to install light rail transit (LRT) tracks on the I-90 Homer Hadley floating bridge as part of the 14-mile long East Link project. Placement of light rail across the floating bridge, the first of its kind, presents unique challenges. The structural system is subject to dynamic, multidimensional movement of the bridge deck at the existing expansion joints, due to changing lake elevations, vehicle traffic loading, wind, waves and, for extreme conditions, the breaking of anchor cables, all of which were addressed in the design. Development of a unique and elegant solution required the collaboration of a team consisting of track engineers, special track work fabricators, structural engineers and research specialists, from the U.S. and U.K., all working with construction experts, to take the project from concept through installation.
机译:中央Puget Sound Region的交通机构,声音过境(ST)正计划在I-90 Homer Hadley Floating Bridge上安装轻轨运输(LRT)轨道,作为14英里长的东部链路项目的一部分。在浮动桥上放置轻轨,首先呈现出独特的挑战。结构系统受到现有扩展关节的动态,多维运动,由于湖升高,车辆交通负荷,风,波浪等,为极端条件,锚固电缆的破坏,所有这些都是解决的在设计中。开发独特而优雅的解决方案需要从美国和U.K的轨道工程师,特殊轨道工作制造商,结构工程师,结构工程师和研究专家组成的团队的合作都与建筑专家一起使用,以通过安装来从概念中获取项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号