To increase production in East Zeit field, the operator wanted to recover a slot occupied by a well with collapsed 30-in conductor. Because of platform constraints, driving new pipe was not an option. Attempts to mill through an obstruction at 600ft were unsuccessful. And because the collapse occurred below the window, it was not possible to recover the damaged conductor and sidetrack. A whipstock system was required that could anchor in the 30-in casing, enabling a full-gauge 16-in window to be milled for sidetracking. However, there are no whipstocks made with anchors large enough to set in 30-in casing. To solve the problem, the service provider proposed running 600ft of 20-in casing inside the 30-in conductor. However, no case histories for dual casing exits at these large sizes were available. Potential problems included ability to mill the 20-in (0.5-in) and 30-in (1.0-in) casing wall thickness; potential mill tracking between the 20-in and 30-in casings; and the availability large milling bits. A unique solution was proposed: set two joints of 20-in casing in slips before running the whipstock; set a 16-in cased-hole WS using an expandable anchor just below the rotary table inside the 20-in casing; pull the entire assembly and hand- cut the window in the 20-in casing; run in hole with the whipstock inside the 20-in casing and cement in place; access and mill an exit through the 30-in conductor through the 20-in casing's precut window. A software program was utilized to ensure the correct alignment of the whipstock face to mitigate the risk of mill tracking. In one trip, the whipstock system was safely run and successfully milled a window in the 30-in casing accessed through the exiting porthole in the 20-in string. The 16-in OD cased-hole whipstock lead and follow mills completed a 22ft long 17 1/2-in exit in the 30-in casing. The exit was milled and dressed in just 11hrs during which 2000 lbs of steel accumulated at the ditch magnets. The minimum window gauge was 16 3/4-in, and the bottom of both windows was at 584ft. This effort marked the first time an exit was completed through 30-in casing. The whipstock assembly also drilled a 20ft rathole allowing the 16-in directional BHA to pass through the casing exit and drill ahead without issues or delay.
机译:为了增加东部Zeit领域的产量,操作员希望通过折叠的30 in导线恢复良好占用的槽。由于平台限制,驾驶新管道不是一种选择。通过600英尺处的阻塞造影试图失败。并且因为窗户下方发生崩塌,因此无法恢复损坏的导体和侧面。需要一个鞭柄系统,其可以锚固在30 - 壳体中,使得能够铣削全格16- in窗口以进行侧面。然而,没有足够大的锚固件在30英寸壳体中制造的鞭脚。为了解决问题,服务提供商提出在30-IN导体内运行600英尺的20英尺20英寸的壳体。然而,没有用于这些大尺寸的双壳体出口的情况历史。潜在的问题包括将20英寸(0.5英寸)和30英寸(1.0英寸)套管厚度磨削的能力; 20英寸和30英寸外壳之间的潜在轧机跟踪;和可用性大的铣削位。提出了一种独特的解决方案:在运行鞭脚之前,在滑块中设定两个20英寸套管的关节;使用20-IN壳体内的旋转台下方的可扩展锚设置一个16型套管Ws;拉动整个组件并在20英寸壳体中切割窗口;用20英寸套管内的鞭子和水泥钻入孔中;通过20-IN壳体的预窗窗口进入和铣削通过30-IN导体出口。利用软件程序来确保鞭脚柄面的正确对准,以减轻磨机跟踪的风险。在一次跳闸中,鞭子系统被安全地运行并在通过20英寸字符串中通过退出舷窗的30-in壳体成功铣削了一个窗户。 16英寸OD套管鞭螺纹灯和以下工厂在30英寸壳体中完成了22英尺1/2英寸1/2英寸。出口被研磨并穿着在仅11小时内,在沟槽磁铁中累积2000磅钢。最小窗口仪表为16 3/4 in,两个窗口的底部为584英尺。这项努力标志着退出第一次通过30-IN套管完成。鞭脚组件还钻了20英尺的rathole,允许16位方向的BHA穿过壳体出口并在没有问题或延迟的情况下前进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号