首页> 外文会议>Society for Mining, Metallurgy Exploration Annual Meeting and Exhibit >OBSERVATIONAL METHOD USING REAL TIME SURFACE SETTLEMENT MONITORING ON THE SOUTH TOULON TUNNEL PROJECT
【24h】

OBSERVATIONAL METHOD USING REAL TIME SURFACE SETTLEMENT MONITORING ON THE SOUTH TOULON TUNNEL PROJECT

机译:南塔隆隧道项目实时表面沉降监测的观测方法

获取原文

摘要

The Toulon tunnel project is a key component of the Highway corridor on the French Riviera between Marseille and Nice and is a fundamental transportation infrastructure for the region. The first design studies started in the 1960's. The tunnel project is made of 2 separate tunnels: South and North tunnel. The North tunnel was built between 1992 and 2002 after 10 years of difficult construction (for example, on March 15th, 1996, a collapse of the tunnel in the "Marchand Area" generated a sink hole in the city Center, causing 20 months delay). The South tunnel alignment runs parallel to the North tunnel at the same depth below Toulon historical downtown (20 to 40m depth with some areas with less than 10m of cover). The Risk management program was studied to be a State of the Art program in urban tunneling construction.
机译:Toulon Tunnel Project是Marseille与Marseille之间的法国里维埃拉的公路走廊的关键组成部分,是该地区的基础交通基础设施。第一个设计研究始于1960年代。隧道项目由2个单独的隧道组成:南北隧道。北隧道建于1992年至2002年,经过10年的艰难建设(例如,1996年3月15日,隧道在“Marchand地区”在市中心产生了一个水槽洞,导致20个月延迟) 。南隧道对齐在北隧道平行于北部隧道,在土伦历史市中心的相同深度(20至40米深度深度,覆盖的一些区域)。在城市隧道建设中,研究了风险管理计划是成为艺术计划的状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号