首页> 外文会议>Australia - New Zealand conference on Geomechanics >Ground Conditions and Geotechnical Parameters for the Perth Waterfront Development, Perth CBD
【24h】

Ground Conditions and Geotechnical Parameters for the Perth Waterfront Development, Perth CBD

机译:Perth CBD的地面条件和岩土工程珀斯滨水开发

获取原文

摘要

The $2.6B Perth Waterfront Project is being undertaken by the WA State Government in partnership with the private sector to reconnect the Swan River with the Perth Central Business District. The project will involve the re-development of approximately 10 hectares of land on the Swan River Foreshore and will feature a 2.7 hectare inlet surrounded by landscaped terraces, boardwalks and promenades. Development sites surrounding the inlet will be sold to private developers for the construction of office, retail and apartment buildings of up to 36 levels. Major earthworks are scheduled to start in 2012. Geotechnical investigations for Phases 1 to 3 of the project were undertaken between 2007 and 2011. This paper provides an introduction to the project, an outline of the geology underlying the project area and summarises the geotechnical design parameters adopted for the various geological units encountered.
机译:沃州州政府与私营部门合作,将与珀斯中央商业区重新联系私营部门的2.6亿美元的珀斯海滨项目。该项目将涉及重新开发天鹅河驻山脉大约10公顷的土地,并将有2.7公顷的入口,包括园景露台,木板走道和长廊。入口处的开发网站将销往私人开发商,以建造高达36级的办公室,零售和公寓楼。主要的土坯工计划于2012年开始。在2007年至2011年期间开展了项目阶段1至3阶段的岩土查询。本文介绍了该项目的概要,项目区域基础的地质概要,总结了岩土设计参数采用各种地质单位遇到的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号