Study on Vibration Laws of Ground Particles Cause by Shallow Tunnel Blasting Construction

机译:浅埋隧洞爆破施工地面粒子振动定律研究

获取原文

摘要

In order to study ground vibration laws of shallow tunnel blasting construction, so in this paper, we put Third Bid of Qingdao Metro Line 3 as the engineering background, selecting the monitoring segment blasting vibration monitoring, studying blasting vibration peak velocity. Basing on the measured data, analyzing the variation regularity resultant velocity vector peak velocity along the tunnel axis direction. The study found that resultant velocity vector peak did not occur just above the tunnel workface, but away from the working face in 1m ~ 1.5m the range. Resultant velocity vector peak located in front of the workface is 1.02 to 1.45 times of resultant velocity vector peak located behind of the workface. Resultant velocity vector peak located in front of the workface is 2.26 to 2.5 times of resultant velocity vector peak above the workface. Resultant velocity vector peak behind the workface is 2.3 to 3 times of resultant velocity vector peak above the workface.
机译:为了研究浅隧道爆破结构的地面振动定律,如本文,我们将青岛地铁3号线3投标为工程背景,选择监测段爆破振动监测,研究爆破振动峰值速度。基于测量数据,分析沿着隧道轴方向的变化规律性速度矢量峰值速度。该研究发现,速度向量峰不会在隧道工作面上方发生,但远离工作面1m〜1.5m的范围。所得到的速度矢量峰位于工作面前面的1.02至1.45倍,得到的速度向量峰位于工作面后面。所得到的速度矢量峰位于工作面前面的2.26至2.5倍的工作面上所得到的速度矢量峰值。工作面后面的结果速度矢量峰值是工作面上所得到的速度矢量峰的2.3至3倍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号