首页> 外文会议>Global Conference on Civil, Structural and Environmental Engineering >Water Inflow Quantity Evaluation and Prediction for Cimushan Tunnel
【24h】

Water Inflow Quantity Evaluation and Prediction for Cimushan Tunnel

机译:山山隧道水流入量评价与预测

获取原文

摘要

Tunnel excavation breaks the original hydrological dynamic balance, promotes water cycle and influences the mountain groundwater system to some extent. Water inflow during construction not only threatens construction safety, but also affects surface vegetation's growth. Taking tunnel 1 in Chongqing Cimushan area as the project background, and through analyzing the hydrological test results from tunnel exploration stage, counting the actual water inflow quantity in construction period, doing the 3-D finite element numerical modeling, we analyzed and evaluated the tunnel water inflow quantity, to provide reference for recognizing the harm of groundwater and making treatment measures.
机译:隧道挖掘破坏原始水文动态平衡,促进水循环,在一定程度上影响山地地下水系统。施工期间的水流入不仅威胁到施工安全性,而且影响表面植被的增长。在重庆晋山地区采取隧道1作为项目​​背景,通过分析隧道勘探阶段的水文测试结果,计算施工期的实际水流入量,做三维有限元数值模拟,我们分析和评估了隧道水流入量,为认识到地下水危害并制造处理措施的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号