首页> 外文会议>ISRM international young scholars' symposium on rock mechanics >Settlement of subway tunnel affected by different pilot tunnel sequences excavation
【24h】

Settlement of subway tunnel affected by different pilot tunnel sequences excavation

机译:不同导频隧道序列挖掘影响地铁隧道的解决

获取原文

摘要

Based on the subway tunnel excavation from Beijing Railway Station to Beijing West Railway Station, the study use FLAC-3D software to simulate 9-pilotsexcavation progresses under traditional and simplified sequences. The results of simulation show the changes of crown settlements, surface subsidence and of settlement trough curve. And the excavation sequences have been optimized, based on the geological conditions. The results are drawn as follows: (1) Settlements of crown and surface with simplified sequence are serious. (2) Settlements for traditional sequence grow dramatically. (3) Settlements of optimized sequence are the smallest. (4) The centerlines of settlement trough return to the centerline of tunnel, when transaction excavation is finished. Consequently, shape of settlement trough should be considered to get the largest settlement value, when supports with high elastic modules are used. The results of optimized show this sequence and analysis methods would bring benefits for double side heading method tunneling.
机译:基于北京火车站到北京西火车站的地铁隧道挖掘,研究使用FLAC-3D软件模拟传统和简化序列下的9-Pilotsexcavation进展。仿真结果表明了冠沉降,表面沉降和沉降槽曲线的变化。并且基于地质条件,已经优化了挖掘序列。结果如下所示:(1)具有简化序列的表冠和表面的沉降。 (2)传统序列的定居点急剧增长。 (3)优化序列的定居点是最小的。 (4)当交易挖掘完成时,结算槽的中心线返回隧道中心线。因此,当使用高弹性模块的支撑时,应考虑沉降槽的形状以获得最大的沉降值。优化的结果显示该序列和分析方法将为双侧标题方法隧道带来益处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号