首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Study on Construction Risk Analysis and Risk Counter-measures of River-crossing Tunnel of Large-diameter Metro
【24h】

Study on Construction Risk Analysis and Risk Counter-measures of River-crossing Tunnel of Large-diameter Metro

机译:大直径地铁河流交叉隧道施工风险分析及风险反对措施研究

获取原文

摘要

There are numerous difficulties and risks in the construction of river-crossing tunnel of large-diameter metro. How to ensure the safety of the project and reduce the construction risk is the key issue requiring urgent solution. This paper, taking a project of constructing river-crossing tunnel of large-diameter metro as the research background, compared and selected the methods of constructing this river-crossing tunnel. Large-diameter slurry shield machine was recommended to conduct digging construction. Then, possible risks of the selected construction method were analyzed and summarized into two categories: risk concerning the project itself and environmental risk. Finally, corresponding measures to handle the risks were put forward.
机译:大直径地铁河流交叉隧道的建设存在许多困难和风险。如何确保项目的安全性并降低施工风险是需要紧急解决方案的关键问题。本文采取了建设大直径地铁河流隧道的项目,作为研究背景,比较,并选择了构建该河流隧道的方法。建议大直径浆料屏蔽机进行挖掘结构。然后,分析并概述了所选施工方法的可能风险:有关项目本身和环境风险的风险。最后,提出了处理风险的相应措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号