首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Research on test of reducing deformation of soft rock tunnel with high stress level by pilot heading
【24h】

Research on test of reducing deformation of soft rock tunnel with high stress level by pilot heading

机译:试验标题高应力水平降低软岩隧道变形的试验研究

获取原文

摘要

Generally speaking, the pilot heading is aways used for geological exploration, speeding up the construction, improving the draining and Ventilation condition, promoting efficiency of residue transporting. When tunneling on high ground stress soft rock region, the pilot heading will play a more important role. Lan yu line Mu Zhai ling tunnel main passes through the region of carbonaceous slate. Due to the high ground stresses, the primary reinforcement system underwent large deformation, evenmore the lining is cracked. Through excaving the pilot heading, can relief the stress. Then enlarg the pilot heading to main tunnel, the deformation of primary support will be reduced, and the tunnel will be stable. Compare the "pilot and enlarging" excavation method with bench excavation method on surrounding rock deformation. As the result, the "pilot and enlarging" excavation method is effective for control of the deformation of the tunnel.
机译:一般来说,试点标题用于地质勘探,加快施工,提高排水和通风条件,促进残留效率。当隧道高地应力软岩地区时,飞行员标题将发挥更重要的作用。兰义线穆寨灵隧道主要通过碳质石板区域。由于高地应力高,初级增强系统经历了大变形,均匀衬里裂开。通过挖掘飞行员标题,可以缓解压力。然后将导频转向主隧道,初级支撑的变形将减少,隧道将稳定。用卧位挖掘方法比较“飞行员扩大”挖掘方法对周围岩石变形的影响。结果,“先导和扩大”挖掘方法对控制隧道变形有效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号