首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Calculation of the Carrying Capacity of Nanping Station Based on Non-Morkov Model
【24h】

Calculation of the Carrying Capacity of Nanping Station Based on Non-Morkov Model

机译:基于非马尔可夫模型的南平站承载力计算

获取原文

摘要

In order to set up a queuing theory model and propose an improved method of capacity calculation, the existing equipment of loading station, railway line situation and technological processes were analyzed, then each operation time was determined in this paper. And queuing system of Nanping Station was taken for example. Based on the system structure and operations of the loading station analysis, a survey of the event flows of the arrivals and services in subsystems to derive the queue parameters of queuing subsystem was made. At last, the system capacity of the loading station was calculated out.
机译:为了建立排队理论模型并提出一种改进的容量计算方法,分析了装载站,铁路情况和技术过程的现有设备,在本文中确定了每个操作时间。例如,纳坪站排队系统。基于装载站分析的系统结构和操作,进行了对子系统的到来和服务的事件流程的调查,以推导出队列子系统的队列参数。最后,计算了装载站的系统容量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号